United States › Grid › Interconnection queues › Rhode Island
GAS · ISO-NETiverton Uprate
Tiverton Uprate is a 306 MW gas request built and operating in the ISO-NE interconnection queue, in Newport County, Rhode Island.
Request details
- Queue ID
- 954
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Interconnection with Narragansett Electric Company's M13 and L14 115kV line taps to NEC's Tiverton substation.
- Location
- Newport County, Rhode Island
- Technology
- Gas: 306 MW
- Total requested
- 306 MW
- Service type
- Network resource (NRIS)
- Study phase
- Executed
- Queue status
- Operational
- Entered queue
- 5 March 2020
- Agreement signed
- 1 January 2023
- Proposed online date
- May 2021
Location
Marker shows the centre of Newport County; the queue data does not give exact sites.
Power plants in Rhode Island · Transmission lines in Rhode Island
Other requests in Newport County
- Tiverton Power LLC UpgradeGas · 21.5 MW · built
- Brayton Road SolarSolar · 8.4 MW · built
- Brayton Road SolarSolar · 3.4 MW · built
- Combined CycleGas · 870 MW · withdrawn
- Combined CycleGas · 285 MW · withdrawn
- Internal CombustionGas · 119 MW · withdrawn
- SolarSolar · 11.0 MW · withdrawn
- CHPGas · 6.3 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem