United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESBattery storage interconnection queue in ERCOT (Texas)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Kickstart Energy Storage VI Battery storage · Kickstart Infrastructure LLC |
1,026 MW | In study |
| Kickstart Energy Storage V Battery storage · Kickstart Infrastructure LLC |
999 MW | In study |
| Nabla Energy Storage I Battery storage · Nabla Park LLC |
750 MW | In study |
| Nabla Energy Storage II Battery storage · Nabla Park LLC |
750 MW | In study |
| Howard Road BESS Battery storage · Project Fast Flow LLC |
618 MW | In study |
| Comanche BESS Battery storage · ENERGOS BESS |
614 MW | In study |
| Symphony BESS Battery storage · Symphony BESS, LLC |
612 MW | In study |
| Lavita BESS Battery storage · Lavita BESS, LLC |
606 MW | In study |
| Hobby BESS I Battery storage · Airport Storage II LLC |
603 MW | In study |
| Tempesta BESS Battery storage |
600 MW | Paused / redesign |
| Capoterra BESS Battery storage |
600 MW | Paused / redesign |
| Brittlebush BESS Battery storage |
597 MW | Paused / redesign |
| Toce TX BESS 2 Battery storage · TOCE TX BESS 2, LLC |
523 MW | In study |
| Knight Airport BESS I Battery storage · Airport Storage I LLC |
523 MW | In study |
| Avalon BESS Battery storage · Avalon BESS, LLC |
522 MW | Agreement signed |
| Falcon BESS Battery storage · Falcon Energy Project, LLC |
517 MW | In study |
| Ochoa Energy Storage II Battery storage · Ochoa Energy Storage II LLC |
517 MW | In study |
| Catamount Storage Battery storage · TOCE TX BESS 3, LLC |
515 MW | In study |
| Seven Angels Energy Storage II Battery storage · Seven Angels Infrastructure LLC |
514 MW | In study |
| Seven Angels Energy Storage I Battery storage · Seven Angels Infrastructure LLC |
514 MW | In study |
| Diamante BESS Battery storage · Flexen USA LLC |
514 MW | In study |
| Midnight Sun Energy Storage Battery storage · Midnight Sun Energy Storage, LLC |
510 MW | Agreement signed |
| Crescent C BESS Battery storage · OCI La Salle ESS LLC |
508 MW | In study |
| Bayside BESS Battery storage |
508 MW | Paused / redesign |
| Point Mountain Storage Battery storage |
507 MW | Paused / redesign |
| Freedom Falcon BESS Battery storage · Falcon BESS, LLC |
502 MW | In study |
| Orbit Energy Storage Battery storage · GCI Orbit Energy Storage, LLC |
502 MW | In study |
| Millsing BESS Battery storage · Millsing BESS |
502 MW | In study |
| Betel Storage I Battery storage · BETEL STORAGE I |
500 MW | In study |
| Betel Storage II Battery storage · BETEL STORAGE II |
500 MW | In study |
| Gamay Energy Storage Battery storage · GAMAY ENERGY STORAGE LLC |
419 MW | Agreement signed |
| Bypass BESS II Battery storage · Bypass BESS II LLC |
416 MW | In study |
| BRP Artemis BESS Battery storage · BRP Artemis BESS LLC |
411 MW | In study |
| BRP Snowdon BESS Battery storage · BRP SNOWDON BESS LLC |
411 MW | In study |
| BRP Mekong BESS Battery storage · BRP Mekong BESS LLC |
410 MW | In study |
| Wilson BESS Battery storage · Dunamis BESS |
410 MW | In study |
| McCamey's Castle Battery Battery storage · Castle Storage, LLC |
410 MW | Agreement signed |
| Beacon Storage Battery storage · AES Distributed Energy, Inc |
409 MW | In study |
| Sigma Storage Battery storage · AES Distributed Energy, Inc |
408 MW | In study |
| Lund Storage Center 1 Battery storage · Lund Storage Center 1, LLC |
408 MW | In study |
| 18-Bravo BESS Battery storage · Scout Energy Management, LLC |
407 MW | In study |
| Claire BESS Battery storage · BRP Blue Topaz 3, LLC |
406 MW | In study |
| Bernice Energy Storage Battery storage · Bernice Energy Storage LLC |
403 MW | In study |
| Merope BESS Battery storage · BRP Merope BESS LLC |
402 MW | In study |
| Iron Belt Energy Storage Battery storage · Iron Belt Energy Storage Project, LLC |
402 MW | Agreement signed |
| Corruscant BESS Battery storage · AEU Battery Project III LLC |
402 MW | In study |
| Aldrin 345 BESS Battery storage · Aldrin Energy Storage LLC |
362 MW | Agreement signed |
| Wildflower Storage Battery storage · Wildflower Storage LLC |
359 MW | In study |
| Brookesmith Storage Battery storage · Brookesmith Storage LLC |
351 MW | In study |
| Rabbit Hollow Energy Storage Battery storage · Rabbit Hollow Energy Storage, LLC |
342 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)724 · 133.4 GW
- West (non-ISO utilities)352 · 82.2 GW
- MISO (Midcontinent)305 · 55.0 GW
- CAISO (California)175 · 48.7 GW
- SPP (Southwest Power Pool)198 · 31.4 GW
- PJM (Mid-Atlantic, Midwest)248 · 29.6 GW
- Southeast (non-ISO utilities)109 · 19.4 GW
- NYISO (New York)84 · 11.1 GW
- ISO-NE (New England)31 · 6,907 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)