United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) (2014 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Mira Loma Hybrid Power Project Gas |
910 MW | Withdrawn / abandoned |
| Viejo Hybrid Power Gas |
910 MW | Withdrawn / abandoned |
| Santa Ana Energy Center Gas |
700 MW | Withdrawn / abandoned |
| Birch Street Generation Facility (Fka Birch Street- Simple Cycle) Gas |
625 MW | Withdrawn / abandoned |
| Grand Ave Generation Facility (Fka Grand Ave Simple Cycle) Gas |
625 MW | Withdrawn / abandoned |
| Nci Hybrid Power Solar + storage |
538 MW | Withdrawn / abandoned |
| Cci Hybrid Power Gas |
508 MW | Withdrawn / abandoned |
| NCC Hybrid Power Gas |
444 MW | Withdrawn / abandoned |
| Grand Ave- Combined Cycle Gas |
378 MW | Withdrawn / abandoned |
| Birch Street - Combined Cycle Gas |
378 MW | Withdrawn / abandoned |
| Diablo Energy Facility Gas |
309 MW | Withdrawn / abandoned |
| Mission Rock Energy Center (Fka Mission Rock Energy Center Flex) Gas |
305 MW | Withdrawn / abandoned |
| Alamitos Energy Storage Battery storage |
300 MW | Withdrawn / abandoned |
| New Heca Gas |
300 MW | Withdrawn / abandoned |
| Jupiter Solar Solar |
250 MW | Withdrawn / abandoned |
| Boulder Solar 3 (Fka: Boulder Solar Power C7) Solar |
250 MW | Withdrawn / abandoned |
| Johanna Energy Center (Fka Johanna Energy Center LMS) Gas |
220 MW | Withdrawn / abandoned |
| SLW (Fka Shu'Luuk Wind) Onshore wind |
160 MW | Withdrawn / abandoned |
| Quartzite Solar 7 Solar |
150 MW | Withdrawn / abandoned |
| Miguel Energy Storage Battery storage |
150 MW | Withdrawn / abandoned |
| Kearny Hybrid Power Solar + storage |
120 MW | Withdrawn / abandoned |
| Grand Ave - Battery System Battery storage |
118 MW | Withdrawn / abandoned |
| Birch Street - Battery System Battery storage |
118 MW | Withdrawn / abandoned |
| Vermillion Solar |
100 MW | Withdrawn / abandoned |
| Spring Mountain Solar Solar |
100 MW | Withdrawn / abandoned |
| High Desert Solar PV Solar |
90.0 MW | Withdrawn / abandoned |
| Sunshine Valley Solar 3 Solar |
65.0 MW | Withdrawn / abandoned |
| Pandora Solar Solar |
60.0 MW | Withdrawn / abandoned |
| SGS Fremont Battery storage |
50.0 MW | Withdrawn / abandoned |
| SKY Valley Wind Onshore wind |
50.0 MW | Withdrawn / abandoned |
| Roadrunner Solar |
50.0 MW | Withdrawn / abandoned |
| Caballo Loco Solar |
50.0 MW | Withdrawn / abandoned |
| Rose Meadow Wind Bank Battery storage |
50.0 MW | Withdrawn / abandoned |
| SGS Livermore (Fka SGS South San Francisco) Battery storage |
50.0 MW | Withdrawn / abandoned |
| Puerta Solar Center Solar |
49.0 MW | Withdrawn / abandoned |
| BCS Energy Storage Solar + storage |
40.0 MW | Withdrawn / abandoned |
| Shingle Springs Grid Stabilization Project Battery storage |
40.0 MW | Withdrawn / abandoned |
| Otay Mesa Energy Center Agp Gas |
35.0 MW | Withdrawn / abandoned |
| Victor Grid Stabilization Project Battery storage |
30.0 MW | Withdrawn / abandoned |
| Colinas De Oro Battery storage |
30.0 MW | Withdrawn / abandoned |
| Tesla Wind Bank Battery storage |
30.0 MW | Withdrawn / abandoned |
| Weber Grid Stabilization Project Battery storage |
25.0 MW | Withdrawn / abandoned |
| Big Potrero Solar |
20.0 MW | Withdrawn / abandoned |
| High Noon Solar |
20.0 MW | Withdrawn / abandoned |
| Mesa Rojo Solar |
20.0 MW | Withdrawn / abandoned |
| Pleasant Grove Grid Stabilization Project Battery storage |
20.0 MW | Withdrawn / abandoned |
| Magellan Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Diablo Energy Storage Battery storage |
20.0 MW | Withdrawn / abandoned |
| Coyote Creek Energy Storage Battery storage |
20.0 MW | Withdrawn / abandoned |
| Stonecrop Solar |
20.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)77 Β· 22.8 GW
- PJM (Mid-Atlantic, Midwest)126 Β· 12.4 GW
- ERCOT (Texas)52 Β· 12.1 GW
- CAISO (California)70 Β· 10.2 GW
- West (non-ISO utilities)151 Β· 9,551 MW
- SPP (Southwest Power Pool)56 Β· 8,704 MW
- Southeast (non-ISO utilities)76 Β· 6,064 MW
- ISO-NE (New England)28 Β· 4,881 MW
- NYISO (New York)30 Β· 1,581 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)