Boulder Solar 3 (Fka: Boulder Solar Power C7)

Boulder Solar 3 (Fka: Boulder Solar Power C7) is a 250 MW solar request withdrawn in the CAISO interconnection queue, in Clark County, Nevada, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2014 (completed)
  2. Withdrawn / abandonedDec 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1069
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
SCE owned Eldorado 220 kV bus
Location
Clark County, Nevada
Technology
Solar: 250 MW
Total requested
250 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2014
Proposed online date
August 2018
Withdrawn
December 2016

Location

Marker shows the centre of Clark County; the queue data does not give exact sites.