United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in CAISO (California) (2013 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown477,426 MW
Active in queue131 MW3 requests
Agreement signed131 MW3 requests
Withdrawn477,426 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

47 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Rio Hondo Power
Gas
1,047 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2013target 2019
Center Power
Gas
910 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2013target 2024
Ventura Clean Energy
Gas
778 MWWithdrawn / abandoned Ventura, CACAISO Apr 2013target 2019
Drew Road Generation
Gas
344 MWWithdrawn / abandoned Imperial, CACAISO Apr 2013target 2018
Hyder Valley Solar Energy
Solar
300 MWWithdrawn / abandoned Maricopa, AZCAISO Apr 2013target 2018
Heca SCS
Other
300 MWWithdrawn / abandoned Kern, CACAISO Apr 2013target 2019
Blue Star Wind Energy Center
Onshore wind
250 MWWithdrawn / abandoned Kern, CACAISO Apr 2013target 2017
Fremont Valley Preservation
Solar
245 MWWithdrawn / abandoned Kern, CACAISO Apr 2013target 2016
Calpeak Border Om 2
Gas
205 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2017
Kramer Solar
Solar
200 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2013target 2016
WP Oceanside
Gas
200 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2017
WP Goleta (Fka WP Oxnard)
Gas
200 MWWithdrawn / abandoned Ventura, CACAISO Apr 2013target 2018
WP Walnut
Gas
200 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2013target 2017
Rancho Wistaria Solar Energy Center
Solar
150 MWWithdrawn / abandoned Imperial, CACAISO Apr 2013target 2016
Silver State South 3 Solar
Solar
150 MWWithdrawn / abandoned Clark, NVCAISO Apr 2013target 2016
Three Peaks Wind
Onshore wind
150 MWWithdrawn / abandoned Kings, CACAISO Apr 2013target 2016
Kings Solar 4
Solar
150 MWWithdrawn / abandoned Kings, CACAISO Apr 2013target 2016
Maricopa 4 Solar Project
Solar
150 MWWithdrawn / abandoned Kern, CACAISO Apr 2013target 2016
Quartz 3 Solar
Solar
150 MWWithdrawn / abandoned Riverside, CACAISO Apr 2013target 2021
GV Solar 3
Solar
120 MWWithdrawn / abandoned Tulare, CACAISO Apr 2013target 2017
Pio Pico 2
Gas
110 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2017
Algonquin Power Sanger 2
Gas
108 MWWithdrawn / abandoned CACAISO Apr 2013target 2020
WP Pendleton
Gas
99.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2016
WP Fallbrook
Gas
99.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2016
DRY Creek (Fka Jasmin Power 3)
Gas
86.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2013target 2017
Benicia Wind
Onshore wind
65.0 MWWithdrawn / abandoned Solano, CACAISO Apr 2013target 2016
Transfer Ridge Wind
Onshore wind
60.0 MWWithdrawn / abandoned Butte, CACAISO Apr 2013target 2016
Huntington Beach 2
Gas
59.3 MWWithdrawn / abandoned Orange, CACAISO Apr 2013target 2023
Lerdo Solar
Solar
50.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2013target 2015
El Cajon Energy Center 2
Gas
49.9 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2015
WP Vande
Gas
49.9 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2016
Lost Hills Cogen
Gas
47.8 MWWithdrawn / abandoned Kern, CACAISO Apr 2013target 2017
Midway Hills Cogen
Gas
47.8 MWWithdrawn / abandoned Kern, CACAISO Apr 2013target 2017
Golden Oasis
Solar
33.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2013target 2021
Fox Solar
Solar
30.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2016
Timba Solar
Solar
20.0 MWWithdrawn / abandoned Stanislaus, CACAISO Apr 2013target 2016
Lasalle Solar Project
Solar
20.0 MWWithdrawn / abandoned Kings, CACAISO Apr 2013target 2016
Kasson Manteca Solar
Solar
20.0 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2013target 2018
Pismo Solar
Solar
20.0 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2013target 2015
Border Solar
Solar
20.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2015
East Nicolaus Solar
Solar
20.0 MWWithdrawn / abandoned Sutter, CACAISO Apr 2013target 2015
Maricopa West Solar PV 2
Solar
20.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2013target 2017
Valley Center Solar
Solar
20.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2015
Livermore Solar
Solar
20.0 MWWithdrawn / abandoned Alameda, CACAISO Apr 2013target 2015
Felipe Solar
Solar
20.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2015
STS Solar
Solar
16.0 MWWithdrawn / abandoned Sonoma, CACAISO Apr 2013target 2015
Lake Clementine Hydroelectric
Hydro
15.5 MWWithdrawn / abandoned Placer, CACAISO Apr 2013target 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)