United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) (2013 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Rio Hondo Power Gas |
1,047 MW | Withdrawn / abandoned |
| Center Power Gas |
910 MW | Withdrawn / abandoned |
| Ventura Clean Energy Gas |
778 MW | Withdrawn / abandoned |
| Drew Road Generation Gas |
344 MW | Withdrawn / abandoned |
| Hyder Valley Solar Energy Solar |
300 MW | Withdrawn / abandoned |
| Heca SCS Other |
300 MW | Withdrawn / abandoned |
| Blue Star Wind Energy Center Onshore wind |
250 MW | Withdrawn / abandoned |
| Fremont Valley Preservation Solar |
245 MW | Withdrawn / abandoned |
| Calpeak Border Om 2 Gas |
205 MW | Withdrawn / abandoned |
| Kramer Solar Solar |
200 MW | Withdrawn / abandoned |
| WP Oceanside Gas |
200 MW | Withdrawn / abandoned |
| WP Goleta (Fka WP Oxnard) Gas |
200 MW | Withdrawn / abandoned |
| WP Walnut Gas |
200 MW | Withdrawn / abandoned |
| Rancho Wistaria Solar Energy Center Solar |
150 MW | Withdrawn / abandoned |
| Silver State South 3 Solar Solar |
150 MW | Withdrawn / abandoned |
| Three Peaks Wind Onshore wind |
150 MW | Withdrawn / abandoned |
| Kings Solar 4 Solar |
150 MW | Withdrawn / abandoned |
| Maricopa 4 Solar Project Solar |
150 MW | Withdrawn / abandoned |
| Quartz 3 Solar Solar |
150 MW | Withdrawn / abandoned |
| GV Solar 3 Solar |
120 MW | Withdrawn / abandoned |
| Pio Pico 2 Gas |
110 MW | Withdrawn / abandoned |
| Algonquin Power Sanger 2 Gas |
108 MW | Withdrawn / abandoned |
| WP Pendleton Gas |
99.0 MW | Withdrawn / abandoned |
| WP Fallbrook Gas |
99.0 MW | Withdrawn / abandoned |
| DRY Creek (Fka Jasmin Power 3) Gas |
86.0 MW | Withdrawn / abandoned |
| Benicia Wind Onshore wind |
65.0 MW | Withdrawn / abandoned |
| Transfer Ridge Wind Onshore wind |
60.0 MW | Withdrawn / abandoned |
| Huntington Beach 2 Gas |
59.3 MW | Withdrawn / abandoned |
| Lerdo Solar Solar |
50.0 MW | Withdrawn / abandoned |
| El Cajon Energy Center 2 Gas |
49.9 MW | Withdrawn / abandoned |
| WP Vande Gas |
49.9 MW | Withdrawn / abandoned |
| Lost Hills Cogen Gas |
47.8 MW | Withdrawn / abandoned |
| Midway Hills Cogen Gas |
47.8 MW | Withdrawn / abandoned |
| Golden Oasis Solar |
33.0 MW | Withdrawn / abandoned |
| Fox Solar Solar |
30.0 MW | Withdrawn / abandoned |
| Timba Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Lasalle Solar Project Solar |
20.0 MW | Withdrawn / abandoned |
| Kasson Manteca Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Pismo Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Border Solar Solar |
20.0 MW | Withdrawn / abandoned |
| East Nicolaus Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Maricopa West Solar PV 2 Solar |
20.0 MW | Withdrawn / abandoned |
| Valley Center Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Livermore Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Felipe Solar Solar |
20.0 MW | Withdrawn / abandoned |
| STS Solar Solar |
16.0 MW | Withdrawn / abandoned |
| Lake Clementine Hydroelectric Hydro |
15.5 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)136 Β· 10.7 GW
- PJM (Mid-Atlantic, Midwest)80 Β· 10.3 GW
- ERCOT (Texas)52 Β· 8,996 MW
- MISO (Midcontinent)42 Β· 7,775 MW
- CAISO (California)47 Β· 7,426 MW
- SPP (Southwest Power Pool)30 Β· 4,501 MW
- Southeast (non-ISO utilities)62 Β· 4,349 MW
- NYISO (New York)4 Β· 953 MW
- ISO-NE (New England)9 Β· 840 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)