Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Alamitos Energy Center Gas |
1,903 MW | Withdrawn / abandoned |
| Huntington Beach Gas |
939 MW | Withdrawn / abandoned |
| Golden Hills Power Gas |
550 MW | Withdrawn / abandoned |
| Sandy Valley Phase II Segs Gas |
540 MW | Withdrawn / abandoned |
| Blythe Mesa Solar II - C5 Solar |
500 MW | Withdrawn / abandoned |
| Redondo Beach Energy Project Gas |
476 MW | Withdrawn / abandoned |
| Vista Power Project Gas |
402 MW | Withdrawn / abandoned |
| Desert Butte Solar Farm Solar |
387 MW | Withdrawn / abandoned |
| Prospect Energy Center Gas |
310 MW | Withdrawn / abandoned |
| Enn Mojave Power 4 Other |
300 MW | Withdrawn / abandoned |
| Tenaska Mountain Basin Gas |
300 MW | Withdrawn / abandoned |
| Enn Mojave Power 3 Other |
300 MW | Withdrawn / abandoned |
| Boulder Solar Power Solar |
300 MW | Withdrawn / abandoned |
| Highwind Power Project Gas |
291 MW | Withdrawn / abandoned |
| Stage Coach Solar Solar + storage |
250 MW | Withdrawn / abandoned |
| Sandy Valley Solar Project Solar |
250 MW | Withdrawn / abandoned |
| Enn Mojave Power 1 Other |
250 MW | Withdrawn / abandoned |
| Mirage Solar Solar |
250 MW | Withdrawn / abandoned |
| Enn Mojave Power 2 Other |
250 MW | Withdrawn / abandoned |
| Palmas C5 Solar |
238 MW | Withdrawn / abandoned |
| Pahrump Valley Solar (Fka Lathrop Wells 240MW) Solar |
210 MW | Withdrawn / abandoned |
| Firebaugh Solar - C5 Solar |
200 MW | Withdrawn / abandoned |
| Copper Rays Solar Solar |
180 MW | Withdrawn / abandoned |
| Townsite Solar Project Solar |
180 MW | Withdrawn / abandoned |
| Delta Solano Wind Onshore wind |
175 MW | Withdrawn / abandoned |
| Mule Mountain - C5 Solar |
150 MW | Withdrawn / abandoned |
| Quartz 1 Solar Solar |
150 MW | Withdrawn / abandoned |
| Quartz 2 Solar Solar |
150 MW | Withdrawn / abandoned |
| Red Mountain Wind Energy Center - C5 Onshore wind |
150 MW | Withdrawn / abandoned |
| Sanborn Solar Solar |
150 MW | Withdrawn / abandoned |
| Siberia Phase III Segs Solar |
140 MW | Withdrawn / abandoned |
| Great Valley Solar 2 Solar |
120 MW | Withdrawn / abandoned |
| Lucerne Valley 100 MW PV Plant Solar |
100 MW | Withdrawn / abandoned |
| Lucerne Solar Energy - C5 Solar |
100 MW | Withdrawn / abandoned |
| Dunnigan Hills Onshore wind |
100 MW | Withdrawn / abandoned |
| Los Robles Solar |
100 MW | Withdrawn / abandoned |
| Belridge Solar Energy 2 Project Solar |
80.0 MW | Withdrawn / abandoned |
| Newhall Solar Energy Project Solar |
80.0 MW | Withdrawn / abandoned |
| Yuha Basin Solar Solar |
75.0 MW | Withdrawn / abandoned |
| Yermo Solar Solar |
75.0 MW | Withdrawn / abandoned |
| Horse Lake Onshore wind |
51.0 MW | Withdrawn / abandoned |
| Backus Solar Energy Solar |
50.0 MW | Withdrawn / abandoned |
| Wellhead Power Nella CHP Gas |
49.0 MW | Withdrawn / abandoned |
| Wellhead Power Lemietta CHP Gas |
49.0 MW | Withdrawn / abandoned |
| Wellhead Power Woodland CHP Gas |
49.0 MW | Withdrawn / abandoned |
| Wellhead Power Midfruit CHP Gas |
49.0 MW | Withdrawn / abandoned |
| Tehachapi Valley Solar I Solar |
45.0 MW | Withdrawn / abandoned |
| KPP - 45 Gas |
45.0 MW | Withdrawn / abandoned |
| SPS As 40MW PV Generation Facility Solar |
40.0 MW | Withdrawn / abandoned |
| Honey Lake Geothermal Project Geothermal |
20.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- PJM (Mid-Atlantic, Midwest)111 Β· 19.3 GW
- CAISO (California)60 Β· 12.3 GW
- West (non-ISO utilities)95 Β· 9,460 MW
- Southeast (non-ISO utilities)36 Β· 9,047 MW
- ERCOT (Texas)24 Β· 6,711 MW
- MISO (Midcontinent)21 Β· 6,395 MW
- SPP (Southwest Power Pool)30 Β· 4,307 MW
- NYISO (New York)10 Β· 1,963 MW
- ISO-NE (New England)10 Β· 996 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)