Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6012.3 GW
Active in queue40.0 MW1 requests
Agreement signed40.0 MW1 requests
Withdrawn6012.3 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

60 requests Β· page 1 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Alamitos Energy Center
Gas
1,903 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2012target 2025
Huntington Beach
Gas
939 MWWithdrawn / abandoned Orange, CACAISO Apr 2012target 2020
Golden Hills Power
Gas
550 MWWithdrawn / abandoned Kern, CACAISO Apr 2012target 2018
Sandy Valley Phase II Segs
Gas
540 MWWithdrawn / abandoned Clark, NVCAISO Apr 2012target 2016
Blythe Mesa Solar II - C5
Solar
500 MWWithdrawn / abandoned Riverside, CACAISO Apr 2012target 2015
Redondo Beach Energy Project
Gas
476 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2012target 2019
Vista Power Project
Gas
402 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2012target 2018
Desert Butte Solar Farm
Solar
387 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2012target 2016
Prospect Energy Center
Gas
310 MWWithdrawn / abandoned Yuba, CACAISO Apr 2012target 2017
Enn Mojave Power 4
Other
300 MWWithdrawn / abandoned Clark, NVCAISO Apr 2012target 2016
Tenaska Mountain Basin
Gas
300 MWWithdrawn / abandoned Kern, CACAISO Apr 2012target 2016
Enn Mojave Power 3
Other
300 MWWithdrawn / abandoned Clark, NVCAISO Apr 2012target 2016
Boulder Solar Power
Solar
300 MWWithdrawn / abandoned Clark, NVCAISO Apr 2012target 2016
Highwind Power Project
Gas
291 MWWithdrawn / abandoned Kern, CACAISO Apr 2012target 2017
Stage Coach Solar
Solar + storage
250 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2012target 2026
Sandy Valley Solar Project
Solar
250 MWWithdrawn / abandoned Nye, NVCAISO Apr 2012target 2018
Enn Mojave Power 1
Other
250 MWWithdrawn / abandoned Clark, NVCAISO Apr 2012target 2016
Mirage Solar
Solar
250 MWWithdrawn / abandoned Kern, CACAISO Apr 2012target 2016
Enn Mojave Power 2
Other
250 MWWithdrawn / abandoned Clark, NVCAISO Apr 2012target 2016
Palmas C5
Solar
238 MWWithdrawn / abandoned Yuma, AZCAISO Apr 2012target 2014
Pahrump Valley Solar (Fka Lathrop Wells 240MW)
Solar
210 MWWithdrawn / abandoned Nye, NVCAISO Apr 2012target 2019
Firebaugh Solar - C5
Solar
200 MWWithdrawn / abandoned Fresno, CACAISO Apr 2012target 2015
Copper Rays Solar
Solar
180 MWWithdrawn / abandoned Nye, NVCAISO Apr 2012target 2013
Townsite Solar Project
Solar
180 MWWithdrawn / abandoned Clark, NVCAISO Apr 2012target 2016
Delta Solano Wind
Onshore wind
175 MWWithdrawn / abandoned Solano, CACAISO Apr 2012target 2015
Mule Mountain - C5
Solar
150 MWWithdrawn / abandoned Riverside, CACAISO Apr 2012target 2016
Quartz 1 Solar
Solar
150 MWWithdrawn / abandoned Riverside, CACAISO Apr 2012target 2016
Quartz 2 Solar
Solar
150 MWWithdrawn / abandoned Riverside, CACAISO Apr 2012target 2016
Red Mountain Wind Energy Center - C5
Onshore wind
150 MWWithdrawn / abandoned Merced, CACAISO Apr 2012target 2015
Sanborn Solar
Solar
150 MWWithdrawn / abandoned Kern, CACAISO Apr 2012target 2015
Siberia Phase III Segs
Solar
140 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2012target 2015
Great Valley Solar 2
Solar
120 MWWithdrawn / abandoned Tulare, CACAISO Apr 2012target 2015
Lucerne Valley 100 MW PV Plant
Solar
100 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2012target 2015
Lucerne Solar Energy - C5
Solar
100 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2012target 2015
Dunnigan Hills
Onshore wind
100 MWWithdrawn / abandoned Yolo, CACAISO Apr 2012target 2013
Los Robles
Solar
100 MWWithdrawn / abandoned San Diego, CACAISO Apr 2012target 2015
Belridge Solar Energy 2 Project
Solar
80.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2012target 2016
Newhall Solar Energy Project
Solar
80.0 MWWithdrawn / abandoned Fresno, CACAISO Apr 2012target 2013
Yuha Basin Solar
Solar
75.0 MWWithdrawn / abandoned Imperial, CACAISO Apr 2012target 2015
Yermo Solar
Solar
75.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2012target 2015
Horse Lake
Onshore wind
51.0 MWWithdrawn / abandoned Lassen, CACAISO Apr 2012target 2013
Backus Solar Energy
Solar
50.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2012target 2018
Wellhead Power Nella CHP
Gas
49.0 MWWithdrawn / abandoned Merced, CACAISO Apr 2012target 2014
Wellhead Power Lemietta CHP
Gas
49.0 MWWithdrawn / abandoned Kings, CACAISO Apr 2012target 2014
Wellhead Power Woodland CHP
Gas
49.0 MWWithdrawn / abandoned Yolo, CACAISO Apr 2012target 2014
Wellhead Power Midfruit CHP
Gas
49.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2012target 2014
Tehachapi Valley Solar I
Solar
45.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2012target 2016
KPP - 45
Gas
45.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2012target 2019
SPS As 40MW PV Generation Facility
Solar
40.0 MWWithdrawn / abandoned Tulare, CACAISO Apr 2012target 2016
Honey Lake Geothermal Project
Geothermal
20.0 MWWithdrawn / abandoned Lassen, CACAISO Apr 2012target 2016
Page 1 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)