United States β€Ί Grid β€Ί Interconnection queues β€Ί Nevada

OTHER Β· CAISO

Enn Mojave Power 4

Enn Mojave Power 4 is a 300 MW other request withdrawn in the CAISO interconnection queue, in Clark County, Nevada, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2012 (completed)
  2. Withdrawn / abandonedMay 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
932
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Mohave-Eldorado 500kV line
Location
Clark County, Nevada
Technology
Solar: 200 MW Β· Gas: 100 MW
Total requested
300 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
2 April 2012
Proposed online date
December 2016
Withdrawn
May 2013

Location

Marker shows the centre of Clark County; the queue data does not give exact sites.

Power plants in Nevada Β· Transmission lines in Nevada

Other requests in Clark County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem