United States › Grid › Interconnection queues › California

GAS · CAISO

Redondo Beach Energy Project

Redondo Beach Energy Project is a 476 MW gas request withdrawn in the CAISO interconnection queue, in Los Angeles County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2012 (completed)
  2. Withdrawn / abandonedNov 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
941
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Redondo Beach Switching Station 230kV
Location
Los Angeles County, California
Technology
Gas: 476 MW
Total requested
476 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
2 April 2012
Proposed online date
January 2019
Withdrawn
November 2013

Location

Marker shows the centre of Los Angeles County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Los Angeles County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem