Pahrump Valley Solar (Fka Lathrop Wells 240MW)

Pahrump Valley Solar (Fka Lathrop Wells 240MW) is a 210 MW solar request withdrawn in the CAISO interconnection queue, in Nye County, Nevada, connecting to VEA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2012 (completed)
  2. Withdrawn / abandonedMar 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
908
Grid region
CAISO (California)
Utility / transmission owner
VEA
Connection point (POI)
Crazy Eyes Tap 230kV
Location
Nye County, Nevada
Technology
Solar: 210 MW
Total requested
210 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
2 April 2012
Proposed online date
February 2019
Withdrawn
March 2015

Location

Marker shows the centre of Nye County; the queue data does not give exact sites.

Power plants in Nevada · Transmission lines in Nevada

Other requests in Nye County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem