United States › Grid › Interconnection queues › Nevada
SOLAR · CAISOPahrump Valley Solar (Fka Lathrop Wells 240MW)
Pahrump Valley Solar (Fka Lathrop Wells 240MW) is a 210 MW solar request withdrawn in the CAISO interconnection queue, in Nye County, Nevada, connecting to VEA.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2012 (completed)
- Withdrawn / abandonedMar 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 908
- Grid region
- CAISO (California)
- Utility / transmission owner
- VEA
- Connection point (POI)
- Crazy Eyes Tap 230kV
- Location
- Nye County, Nevada
- Technology
- Solar: 210 MW
- Total requested
- 210 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 2 April 2012
- Proposed online date
- February 2019
- Withdrawn
- March 2015
Location
Marker shows the centre of Nye County; the queue data does not give exact sites.
Other requests in Nye County
- Silver Star SolarSolar + storage · 1,034 MW · agreement signed
- Rock Valley Energy CenterSolar + storage · 1,024 MW · agreement signed
- Rough Hat Hybrid SolarSolar + storage · 404 MW · agreement signed
- Water Rock Solar 1Solar + storage · 400 MW · agreement signed
- Sunshine Valley Solar 1Solar + storage · 90.0 MW · agreement signed
- Ares NevadaBattery storage · 44.0 MW · agreement signed
- Water Rock Solar 2Solar + storage · 1,034 MW · in study
- Solar + storage project Company 238, Nye CountySolar + storage · 1,000 MW · in study
- BristleconeSolar + storage · 921 MW · in study
- Solar + storage project Company 254, Nye CountySolar + storage · 600 MW · in study
- Solar + storage project Company 255, Nye CountySolar + storage · 600 MW · in study
- Solar + storage project Company 256, Nye CountySolar + storage · 500 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem