United States › Grid › Interconnection queues › California

GAS · CAISO

Alamitos Energy Center

Alamitos Energy Center is a 1,903 MW gas request withdrawn in the CAISO interconnection queue, in Los Angeles County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2012 (completed)
  2. Withdrawn / abandonedAug 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
939
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Alamitos Switching Station 230kV
Location
Los Angeles County, California
Technology
Gas: 1,903 MW
Total requested
1,903 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
2 April 2012
Proposed online date
November 2025
Withdrawn
August 2012

Location

Marker shows the centre of Los Angeles County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Los Angeles County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem