🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

Stage Coach Solar

Stage Coach Solar is a 250 MW solar + storage request withdrawn in the CAISO interconnection queue, in San Bernardino County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2012 (completed)
  2. Withdrawn / abandonedJan 2025 (project stopped here)
  3. ConsentedJan 2016 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
897
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Calcite Substation 220kV bus
Location
San Bernardino County, California
Technology
Solar: 200 MW · Battery: 50.0 MW
Total requested
250 MW
Service type
Energy only (ERIS)
Study phase
Terminated
Queue status
Withdrawn
Entered queue
2 April 2012
Agreement signed
29 January 2016
Proposed online date
August 2026
Withdrawn
January 2025

Location

Marker shows the centre of San Bernardino County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Bernardino County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem