OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in Texas — page 9
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Lonesome Dove BESS Battery storage |
256 MW | Paused / redesign |
| Champs Elysees BESS Battery storage · Champs Elysees Renewables, LLC |
256 MW | In study |
| Nouveau BESS Battery storage · RamZ BESS, LLC |
256 MW | In study |
| Solar project GEN-2024-063, Lamb County Solar |
256 MW | In study |
| Bayou Creek Solar Solar · Ferrovial Energy US 1 |
256 MW | In study |
| Sierra Madre Solar Solar · Sierra Madre Solar LLC |
255 MW | In study |
| San Gabriel Solar Solar + storage · San Gabriel Solar LLC |
255 MW | In study |
| Maleza Solar II Solar + storage · Brush Solar, LLC |
255 MW | In study |
| PowerVault BESS Battery storage · SMT Elm Mott BESS |
255 MW | In study |
| Railway BESS Battery storage |
255 MW | Paused / redesign |
| Staked Plains BESS Battery storage |
255 MW | Paused / redesign |
| Grand Mesa BESS Battery storage · PERRY GREEN POWER LLC |
253 MW | In study |
| Collier Ranch Solar Solar |
253 MW | Paused / redesign |
| Armstrong Wind Onshore wind · Big Sky Energy |
253 MW | Paused / redesign |
| Bayside II Solar Solar |
253 MW | Paused / redesign |
| Tall Saddle Solar Solar · Tall Saddle Solar, LLC |
252 MW | In study |
| Bayside 2 BESS Battery storage |
252 MW | Paused / redesign |
| Lazy U Solar 2 Solar · Lazy U Solar 2 |
252 MW | In study |
| Pandora Solar Solar |
252 MW | Paused / redesign |
| Little Ridge Storage Battery storage · TX BESS B LLC |
252 MW | In study |
| Lazy U Solar 1 Solar · Lazy U Solar 1 |
252 MW | In study |
| Straight Spur Solar Solar + storage · ENGIE IR Holdings LLC |
252 MW | In study |
| Velociraptor Solar II Solar + storage · Greyhound Solar 3 LLC |
252 MW | In study |
| Velociraptor Solar I Solar + storage · Greyhound Solar 2 |
252 MW | In study |
| Ogalalla Storage Battery storage · Hecate Energy Ogalalla Solar LLC |
252 MW | In study |
| Paint Brush PV2 Solar · Renew Development HoldCo LLC |
252 MW | In study |
| Juniper Ridge BESS 2 Battery storage · Lazy U ESS 2 |
252 MW | In study |
| Paint Brush PV3 Solar · Renew Development HoldCo LLC |
252 MW | In study |
| Cowboy Power Gas Plant Gas · Vaquero Power, LLC |
252 MW | In study |
| Paint Brush PV4 Solar · Renew Development HoldCo LLC |
252 MW | In study |
| Paint Brush PV1 Solar · Renew Development HoldCo LLC |
252 MW | In study |
| Juniper Ridge BESS 1 Battery storage · Lazy U ESS 1 |
252 MW | In study |
| Buffalo Meadow Solar Solar + storage · Buffalo Meadow Energy Center, LLC |
251 MW | In study |
| Mesa View Storage Battery storage · Mesa View Storage, LLC |
251 MW | In study |
| Oak Valley Solar Solar · Oak Valley Solar LLC |
251 MW | In study |
| Brela BESS LLC Battery storage · Brela BESS LLC |
251 MW | In study |
| Black Hawk Solar Solar · ACE DevCo NC, LLC |
251 MW | In study |
| Wake Wind Energy Onshore wind · WAKE WIND ENERGY |
251 MW | In study |
| Fort Concho Energy storage Battery storage · Rocky Mountain Energy Development, LLC |
251 MW | In study |
| Cantaloupe Storage Battery storage |
251 MW | Paused / redesign |
| Tiger Storage Battery storage |
251 MW | Paused / redesign |
| Skeeter Solar Solar · Mesquite Solar, LLC |
251 MW | In study |
| Parula Energy Center Battery storage · Parula Energy Center |
251 MW | In study |
| Senator Aggreko Solar Solar + storage · Senator Aggreko Solar LLC |
251 MW | In study |
| Bluegill BESS Battery storage · Bluegill BESS, LLC |
251 MW | In study |
| Alkali Creek Wind 2 Onshore wind · Alkali Creek Wind, LLC |
250 MW | In study |
| Kontiki 2 Wind (ERNEST) Onshore wind |
250 MW | Paused / redesign |
| Kontiki 1 Wind (ERIK) Onshore wind |
250 MW | Paused / redesign |
| Ca-CO-250B Battery storage |
250 MW | In study |
| Solar project GEN-2024-232, Houston County Solar |
250 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)1,398 · 327.9 GW
- SPP (Southwest Power Pool)61 · 16.6 GW
- MISO (Midcontinent)22 · 6,012 MW
- West (non-ISO utilities)5 · 997 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)