United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in ERCOT (Texas) — page 9
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Mesa View Storage Battery storage · Mesa View Storage, LLC |
251 MW | In study |
| Oak Valley Solar Solar · Oak Valley Solar LLC |
251 MW | In study |
| Brela BESS LLC Battery storage · Brela BESS LLC |
251 MW | In study |
| Black Hawk Solar Solar · ACE DevCo NC, LLC |
251 MW | In study |
| Wake Wind Energy Onshore wind · WAKE WIND ENERGY |
251 MW | In study |
| Fort Concho Energy storage Battery storage · Rocky Mountain Energy Development, LLC |
251 MW | In study |
| Cantaloupe Storage Battery storage |
251 MW | Paused / redesign |
| Tiger Storage Battery storage |
251 MW | Paused / redesign |
| Skeeter Solar Solar · Mesquite Solar, LLC |
251 MW | In study |
| Parula Energy Center Battery storage · Parula Energy Center |
251 MW | In study |
| Senator Aggreko Solar Solar + storage · Senator Aggreko Solar LLC |
251 MW | In study |
| Bluegill BESS Battery storage · Bluegill BESS, LLC |
251 MW | In study |
| Alkali Creek Wind 2 Onshore wind · Alkali Creek Wind, LLC |
250 MW | In study |
| Kontiki 2 Wind (ERNEST) Onshore wind |
250 MW | Paused / redesign |
| Kontiki 1 Wind (ERIK) Onshore wind |
250 MW | Paused / redesign |
| Cascade Storage Battery storage |
250 MW | Paused / redesign |
| Iguala Solar Solar |
250 MW | Paused / redesign |
| Grandview 5 W Onshore wind · Eon |
249 MW | Paused / redesign |
| Straight Spur Wind Onshore wind · ENGIE IR Holdings LLC |
247 MW | In study |
| Bluewind BESS Battery storage · Bluewind Energy Center, LLC |
247 MW | In study |
| Hill Valley BESS Battery storage · Hill Valley BESS, LLC |
246 MW | In study |
| Mojo BESS Solar + storage · Power Synergy |
246 MW | In study |
| Apricot Sun Solar Solar + storage · Apricot Sun Energy Center, LLC |
246 MW | In study |
| Dempsey Solar SLF Solar + storage · Dempsey Solar LLC |
245 MW | In study |
| Morada Del Sol Solar Solar · First Solar |
245 MW | Paused / redesign |
| Gail Mountain Solar Solar · Gail Mountain Solar, LLC |
244 MW | In study |
| Brazos Bend Solar SLF Solar + storage · Grenergy USA |
243 MW | In study |
| Brazos Bend Storage SLF Solar + storage · Grenergy USA |
243 MW | In study |
| Lutum Wind Onshore wind · RWE |
242 MW | In study |
| Diaz BESS Battery storage · BRP Blue Topaz 10, LLC |
242 MW | In study |
| Best Southwest BESS Battery storage |
241 MW | Paused / redesign |
| Easy Wind Energy Center Wind + storage · Easy Wind Energy Center, LLC |
241 MW | In study |
| Jane Storage Energy Center Battery storage · NMRE Holdings, LLC |
241 MW | In study |
| Giddings Wind Onshore wind · Pioneer Natural Resources |
240 MW | In study |
| Razorbill Solar Solar + storage · RWE Solar Development, LLC |
240 MW | In study |
| Camino Ranch Storage 2 SLF Solar + storage · Camino Ranch Solar LLC |
239 MW | In study |
| Campsey Wind Onshore wind · RWE Clean Energy Development, LLC |
238 MW | In study |
| Camino Ranch Solar 2 SLF Solar + storage · Camino Ranch Solar Project LLC |
237 MW | In study |
| DeSpain Solar Project Solar · Gransolar Texas Thirteen LLC |
236 MW | In study |
| Kuy Creek Solar 1 SLF Solar + storage · Kuy Creek Solar 1 LLC |
235 MW | In study |
| Bora Bora Solar Solar |
233 MW | Paused / redesign |
| Cricket Storage Battery storage · Cricket Storage, LLC |
232 MW | In study |
| Petunia Storage Project Battery storage · Petunia Storage Project LLC |
232 MW | In study |
| Larrea Solar Solar · Greasewood IV LLC |
232 MW | In study |
| Allthorn Solar Solar + storage · ALLTHORN SOLAR, LLC |
232 MW | In study |
| Rio Grand Valley Element Fuels Power Other · Element H2Gen, LLC |
230 MW | In study |
| Rubicon Echo Wind Onshore wind |
228 MW | Paused / redesign |
| GridGuardian BESS Battery storage · SMT Temple BESS LLC |
228 MW | In study |
| Pluto Solar Solar |
228 MW | Paused / redesign |
| Houston BESS Battery storage · SMT Houston |
228 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)