United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in CAISO (California) — page 9

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,186619.9 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,186 requests · page 9 of 44
ProjectCapacityStatusLocationRegionQueuedOnline
Delta Wind II
Onshore wind
500 MWWithdrawn / abandoned Solano, CACAISO Feb 2007target 2011
SV Energy Storage Facility
Battery storage
500 MWWithdrawn / abandoned San Diego, CACAISO Apr 2019target 2026
Mars Landing
Battery storage
496 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Greasewood Hybrid
Solar + storage
494 MWWithdrawn / abandoned Colusa, CACAISO Apr 2020target 2023
Baca
Battery storage
491 MWWithdrawn / abandoned Merced, CACAISO Apr 2023target 2028
Calaveras Wind Project (100/383MW)
Other
483 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2015
RRG Solar
Solar
480 MWWithdrawn / abandoned Kern, CACAISO Jul 2010target 2014
Redondo Beach Energy Project
Gas
476 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2012target 2019
Gwent Storage 2
Battery storage
473 MWWithdrawn / abandoned Ventura, CACAISO Apr 2021target 2033
Fokus Renewable Energy Center
Other
472 MWWithdrawn / abandoned Kern, CACAISO Apr 2019target 2023
Black Rock 1,2,3,4, & 5,6
Geothermal
470 MWWithdrawn / abandoned Imperial, CACAISO Mar 2011target 2015
Salvador
Solar + storage
470 MWWithdrawn / abandoned Riverside, CACAISO Apr 2021target 2030
Velas
Battery storage
463 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2021target 2031
Koufax Power Bank
Battery storage
462 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Big Duck Storage
Battery storage
462 MWWithdrawn / abandoned Fresno, CACAISO Apr 2019target 2022
Leopard Storage
Battery storage
459 MWWithdrawn / abandoned Merced, CACAISO Apr 2023target 2031
Bull Run
Solar + storage
457 MWWithdrawn / abandoned Butte, CACAISO Apr 2021target 2030
Longmeadow Hybrid Solar
Solar + storage
456 MWWithdrawn / abandoned Riverside, CACAISO Apr 2021target 2024
Torbino Energy Storage
Solar
455 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Sun Streams 4
Solar + storage
450 MWWithdrawn / abandoned Maricopa, AZCAISO Apr 2020target 2024
Ranchero Solar
Solar + storage
450 MWWithdrawn / abandoned Colusa, CACAISO Apr 2019target 2023
Bonanza Solar 2
Solar + storage
450 MWWithdrawn / abandoned Clark, NVCAISO Apr 2020target 2024
FRV Eafb Solar
Solar
450 MWWithdrawn / abandoned Kern, CACAISO Feb 2010target 2013
Lupine Storage
Battery storage
450 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Desert Garnet PV
Solar
450 MWWithdrawn / abandoned San Bernardino, CACAISO May 2007target 2016
La Paloma Peaking
Gas
450 MWWithdrawn / abandoned Kern, CACAISO May 2008target 2011
Desert Onyx PV
Solar
450 MWWithdrawn / abandoned San Bernardino, CACAISO May 2007target 2015
Triumph Solar
Solar + storage
450 MWWithdrawn / abandoned Tulare, CACAISO Apr 2019target 2023
Yuha Basin Hybrid Solar Energy Project
Solar
450 MWWithdrawn / abandoned Imperial, CACAISO May 2008target 2012
NCC Hybrid Power
Gas
444 MWWithdrawn / abandoned San Diego, CACAISO Apr 2014target 2019
Grizzly Bay Energy
Solar + storage
438 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Well Springs Solar
Solar + storage
438 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Ponderosa Energy
Solar + storage
438 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Picacho Point Energy
Solar + storage
438 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Lost Palms Solar
Solar + storage
438 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Sultana Solar
Solar + storage
438 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Clay Flats
Battery storage
437 MWWithdrawn / abandoned Kings, CACAISO Apr 2023target 2030
El Segundo Energy Center 2 ( Fka El Segundo Energy Center-II)
Gas
435 MWWithdrawn / abandoned Los Angeles, CACAISO Mar 2011target 2020
Clay Flats Solar
Battery storage
434 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Trestles Energy Storage
Battery storage
434 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2019target 2022
Panoche Energy Center
Gas
432 MWWithdrawn / abandoned Fresno, CACAISO Dec 2017target 2018
Gilmore Solar
Solar + storage
430 MWWithdrawn / abandoned Tulare, CACAISO Apr 2021target 2025
Amaryllis Solar
Solar + storage
430 MWWithdrawn / abandoned Tulare, CACAISO Apr 2021target 2026
South Bristol Mountains Wind Farm
Other
429 MWWithdrawn / abandoned San Bernardino, CACAISO Jul 2007target 2010
Souza Solar
Solar + storage
429 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2021target 2025
Conlouge Solar
Solar + storage
428 MWWithdrawn / abandoned Tulare, CACAISO Apr 2021target 2025
Tumey
Solar + storage
428 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Hela
Solar + storage
428 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Potosi
Solar + storage
428 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Dove
Solar + storage
428 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Page 9 of 44

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)