United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) — page 9
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Delta Wind II Onshore wind |
500 MW | Withdrawn / abandoned |
| SV Energy Storage Facility Battery storage |
500 MW | Withdrawn / abandoned |
| Mars Landing Battery storage |
496 MW | Withdrawn / abandoned |
| Greasewood Hybrid Solar + storage |
494 MW | Withdrawn / abandoned |
| Baca Battery storage |
491 MW | Withdrawn / abandoned |
| Calaveras Wind Project (100/383MW) Other |
483 MW | Withdrawn / abandoned |
| RRG Solar Solar |
480 MW | Withdrawn / abandoned |
| Redondo Beach Energy Project Gas |
476 MW | Withdrawn / abandoned |
| Gwent Storage 2 Battery storage |
473 MW | Withdrawn / abandoned |
| Fokus Renewable Energy Center Other |
472 MW | Withdrawn / abandoned |
| Black Rock 1,2,3,4, & 5,6 Geothermal |
470 MW | Withdrawn / abandoned |
| Salvador Solar + storage |
470 MW | Withdrawn / abandoned |
| Velas Battery storage |
463 MW | Withdrawn / abandoned |
| Koufax Power Bank Battery storage |
462 MW | Withdrawn / abandoned |
| Big Duck Storage Battery storage |
462 MW | Withdrawn / abandoned |
| Leopard Storage Battery storage |
459 MW | Withdrawn / abandoned |
| Bull Run Solar + storage |
457 MW | Withdrawn / abandoned |
| Longmeadow Hybrid Solar Solar + storage |
456 MW | Withdrawn / abandoned |
| Torbino Energy Storage Solar |
455 MW | Withdrawn / abandoned |
| Sun Streams 4 Solar + storage |
450 MW | Withdrawn / abandoned |
| Ranchero Solar Solar + storage |
450 MW | Withdrawn / abandoned |
| Bonanza Solar 2 Solar + storage |
450 MW | Withdrawn / abandoned |
| FRV Eafb Solar Solar |
450 MW | Withdrawn / abandoned |
| Lupine Storage Battery storage |
450 MW | Withdrawn / abandoned |
| Desert Garnet PV Solar |
450 MW | Withdrawn / abandoned |
| La Paloma Peaking Gas |
450 MW | Withdrawn / abandoned |
| Desert Onyx PV Solar |
450 MW | Withdrawn / abandoned |
| Triumph Solar Solar + storage |
450 MW | Withdrawn / abandoned |
| Yuha Basin Hybrid Solar Energy Project Solar |
450 MW | Withdrawn / abandoned |
| NCC Hybrid Power Gas |
444 MW | Withdrawn / abandoned |
| Grizzly Bay Energy Solar + storage |
438 MW | Withdrawn / abandoned |
| Well Springs Solar Solar + storage |
438 MW | Withdrawn / abandoned |
| Ponderosa Energy Solar + storage |
438 MW | Withdrawn / abandoned |
| Picacho Point Energy Solar + storage |
438 MW | Withdrawn / abandoned |
| Lost Palms Solar Solar + storage |
438 MW | Withdrawn / abandoned |
| Sultana Solar Solar + storage |
438 MW | Withdrawn / abandoned |
| Clay Flats Battery storage |
437 MW | Withdrawn / abandoned |
| El Segundo Energy Center 2 ( Fka El Segundo Energy Center-II) Gas |
435 MW | Withdrawn / abandoned |
| Clay Flats Solar Battery storage |
434 MW | Withdrawn / abandoned |
| Trestles Energy Storage Battery storage |
434 MW | Withdrawn / abandoned |
| Panoche Energy Center Gas |
432 MW | Withdrawn / abandoned |
| Gilmore Solar Solar + storage |
430 MW | Withdrawn / abandoned |
| Amaryllis Solar Solar + storage |
430 MW | Withdrawn / abandoned |
| South Bristol Mountains Wind Farm Other |
429 MW | Withdrawn / abandoned |
| Souza Solar Solar + storage |
429 MW | Withdrawn / abandoned |
| Conlouge Solar Solar + storage |
428 MW | Withdrawn / abandoned |
| Tumey Solar + storage |
428 MW | Withdrawn / abandoned |
| Hela Solar + storage |
428 MW | Withdrawn / abandoned |
| Potosi Solar + storage |
428 MW | Withdrawn / abandoned |
| Dove Solar + storage |
428 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)