United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

Longmeadow Hybrid Solar

Longmeadow Hybrid Solar is a 456 MW solar + storage request withdrawn in the CAISO interconnection queue, in Riverside County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedNov 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2047
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Red Bluff Substation 220 kV
Location
Riverside County, California
Technology
Solar: 228 MW · Battery: 228 MW
Total requested
456 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
December 2024
Withdrawn
November 2022

Location

Marker shows the centre of Riverside County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Riverside County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem