United States › Grid › Interconnection queues › California

GAS · CAISO

El Segundo Energy Center 2 ( Fka El Segundo Energy Center-II)

El Segundo Energy Center 2 ( Fka El Segundo Energy Center-II) is a 435 MW gas request withdrawn in the CAISO interconnection queue, in Los Angeles County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2011 (completed)
  2. Withdrawn / abandonedApr 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
702
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
El Segundo Substation 230kV Bus
Location
Los Angeles County, California
Technology
Gas: 435 MW
Total requested
435 MW
Service type
Network resource (NRIS)
Study phase
Executed
Queue status
Withdrawn
Entered queue
31 March 2011
Proposed online date
March 2020
Withdrawn
April 2017

Location

Marker shows the centre of Los Angeles County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Los Angeles County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem