United States › Grid › Interconnection queues › California

OTHER · CAISO

Fokus Renewable Energy Center

Fokus Renewable Energy Center is a 472 MW other request withdrawn in the CAISO interconnection queue, in Kern County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedJul 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1602
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Highwind Substation 230kV
Location
Kern County, California
Technology
Solar: 152 MW · Wind: 168 MW · Battery: 152 MW
Total requested
472 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2019
Proposed online date
December 2023
Withdrawn
July 2019

Location

Marker shows the centre of Kern County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Kern County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem