United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

Souza Solar

Souza Solar is a 429 MW solar + storage request withdrawn in the CAISO interconnection queue, in Los Angeles County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedSep 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2100
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Vincent-Lugo 500 kV line
Location
Los Angeles County, California
Technology
Solar: 215 MW · Battery: 214 MW
Total requested
429 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
October 2025
Withdrawn
September 2021

Location

Marker shows the centre of Los Angeles County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Los Angeles County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem