Desert Onyx PV is a 450 MW solar request withdrawn in the CAISO interconnection queue, in San Bernardino County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2007 (completed)
  2. Withdrawn / abandonedDec 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
221
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Cool Water-Kramer #1 230kV line
Location
San Bernardino County, California
Technology
Solar: 450 MW
Total requested
450 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
23 May 2007
Proposed online date
November 2015
Withdrawn
December 2009

Location

Marker shows the centre of San Bernardino County; the queue data does not give exact sites.