United States › Grid › Interconnection queues › New York
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in New York — page 8
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| NY125B - Two Rivers Solar Solar · Boralex US Development LLC |
200 MW | Withdrawn / abandoned |
| North Slope Wind Onshore wind · EDP Renewables North America |
200 MW | Withdrawn / abandoned |
| Rosalen Solar Energy Center Solar + storage · EDF Renewables Development, Inc. |
200 MW | Withdrawn / abandoned |
| Cross County Energy Storage Battery storage · HW Power, LLC |
200 MW | Withdrawn / abandoned |
| Northline Energy Center Battery storage · Northline Energy Center, LLC |
200 MW | Withdrawn / abandoned |
| Riptide Storage Battery storage · ACE DevCo NC, LLC |
200 MW | Withdrawn / abandoned |
| QMB2 Storage II Battery storage · QMB 2 Energy Storage, LLC |
200 MW | Withdrawn / abandoned |
| Independence BESS Battery storage · Independence BESS LLC |
200 MW | Withdrawn / abandoned |
| Sweet Valley Storage Battery storage · Sweet Valley Energy Center, LLC |
200 MW | Withdrawn / abandoned |
| Wishbone Solar Solar · ACE DevCo NC, LLC |
200 MW | Withdrawn / abandoned |
| CWW 200 Wind Onshore wind · Diamond Generating Corporation |
200 MW | Withdrawn / abandoned |
| Fraser Storage Battery storage · EDF renewables development inc. |
200 MW | Withdrawn / abandoned |
| Opal Storage Project Battery storage · Hanwha Q CELLS USA |
200 MW | Withdrawn / abandoned |
| Bay Breeze Solar Solar · ACE DevCo NC, LLC |
200 MW | Withdrawn / abandoned |
| Kce NY 35 Battery storage · KCE NY 35, LLC |
200 MW | Withdrawn / abandoned |
| Hudson Energy Storage Battery storage · BPUS Generation Development LLC |
200 MW | Withdrawn / abandoned |
| North Watertown BESS Battery storage · ACE DevCo NC,LLC |
200 MW | Withdrawn / abandoned |
| Grapevine Storage Battery storage · Grapevine Storage LLC |
200 MW | Withdrawn / abandoned |
| Blue Frost Storage I Battery storage · Blue Frost Energy Center, LLC |
200 MW | Withdrawn / abandoned |
| Gillie Brook Solar Solar · ACE DevCo NC, LLC |
200 MW | Withdrawn / abandoned |
| Chateauguay BESS Battery storage · Capital Region Energy Storage LLC |
200 MW | Withdrawn / abandoned |
| Berrians GT Gas · NRG Energy |
200 MW | Withdrawn / abandoned |
| White Spring Solar Solar · sPower Development Company, LLC |
200 MW | Withdrawn / abandoned |
| Barrett Energy Storage Center Battery storage · Island Park Energy Center, LLC |
200 MW | Withdrawn / abandoned |
| Riverline Energy Center Battery storage · Riverline Energy Center, LLC |
200 MW | Withdrawn / abandoned |
| BPP NY Somerset BESS I Battery storage · Bear Peak Power |
200 MW | Withdrawn / abandoned |
| Topaz Storage Project Battery storage · Hanwha Q CELLS USA |
200 MW | Withdrawn / abandoned |
| Egc BESS II Battery storage · Jupiter Power LLC |
200 MW | Withdrawn / abandoned |
| QMB2 Energy Storage, LLC Battery storage · QMB2 Energy Storage, LLC |
200 MW | Withdrawn / abandoned |
| Harvest Hills Solar Solar · ConnectGen Cayuga County LLC |
200 MW | Withdrawn / abandoned |
| Riptide Storage Battery storage · ACE DevCo NC,LLC |
200 MW | Withdrawn / abandoned |
| Sweet Valley Storage Battery storage · Sweet Valley Energy Center |
200 MW | Withdrawn / abandoned |
| Sapphire Solar and Storage Solar + storage · Hanwha Q CELLS USA |
200 MW | Withdrawn / abandoned |
| EI Steinway 1.1 Offshore wind · Beacon Wind LLC |
200 MW | Withdrawn / abandoned |
| Southern Tier Energy Center Battery storage · Southern Tier Energy Center, LLC |
200 MW | Withdrawn / abandoned |
| Sullivan County Solar & BESS Solar + storage · RWE Solar Development |
200 MW | Withdrawn / abandoned |
| Mossy Bank Solar Solar · ACE DevCo NC, LLC |
200 MW | Withdrawn / abandoned |
| Flat Creek Solar Solar · Flat Creek Solar NY LLC |
200 MW | Withdrawn / abandoned |
| BPP NY Lansing BESS I Battery storage · Bear Peak Power LLC |
200 MW | Withdrawn / abandoned |
| Harvest Hills Solar Solar + storage · ConnectGen Cayuga County LLC |
200 MW | Withdrawn / abandoned |
| Ditch Creek Solar Solar + storage · Nexamp Solar LLC |
200 MW | Withdrawn / abandoned |
| Independence BESS Battery storage · Independence BESS LLC |
200 MW | Withdrawn / abandoned |
| Nine Mile Wind Energy Onshore wind · Terra-Gen Development Company, LLC |
200 MW | Withdrawn / abandoned |
| Ditch Creek Solar + storage · Ditch Creek Solar LLC |
200 MW | Withdrawn / abandoned |
| BPP NY Somerset BESS I LLC Battery storage · BPP NY Somerset BESS I LLC |
200 MW | Withdrawn / abandoned |
| North Creek Solar + storage · North Creek Solar LLC |
200 MW | Withdrawn / abandoned |
| Machias II Onshore wind · Machias Wind Farm, LLC |
200 MW | Withdrawn / abandoned |
| ELP Clay Storage Battery storage · ELP Clay Storage LLC |
199 MW | Withdrawn / abandoned |
| Verona Solar I Solar · Verona Solar |
199 MW | Withdrawn / abandoned |
| Summersweet Energy Center Battery storage · Summersweet Energy Center, LLC |
199 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)