BATTERY STORAGE · NYISONorthline Energy Center
Northline Energy Center is a 200 MW battery storage request withdrawn in the NYISO interconnection queue, in Clinton County, New York, connecting to NYPA.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2021 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1181
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYPA
- Developer
- Northline Energy Center, LLC
- Connection point (POI)
- Pathnode-Duley 230 kV line
- Location
- Clinton County, New York
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Queue status
- Withdrawn
- Entered queue
- 20 May 2021
Location
Marker shows the centre of Clinton County; the queue data does not give exact sites.
Other requests in Clinton County
- Bull Run II WindOnshore wind · 449 MW · in study
- Valcour StorageBattery storage · 150 MW · in study
- Leo Energy StorageBattery storage · 75.0 MW · in study
- Marble River II Wind FarmOnshore wind · 132 MW · built
- Marble River II Wind FarmOnshore wind · 132 MW · built
- Altona WindfieldOnshore wind · 99.0 MW · built
- Altona WindfieldOnshore wind · 99.0 MW · built
- Marble River Wind FarmOnshore wind · 83.0 MW · built
- Marble River Wind FarmOnshore wind · 83.0 MW · built
- Ellenburg WindfieldOnshore wind · 81.0 MW · built
- Ellenburg WindfieldOnshore wind · 81.0 MW · built
- Clinton WindfieldOnshore wind · 79.5 MW · built