BATTERY STORAGE · NYISO

Riptide Storage

Riptide Storage is a 200 MW battery storage request withdrawn in the NYISO interconnection queue, in Suffolk County, New York, connecting to LIPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1576
Grid region
NYISO (New York)
Utility / transmission owner
LIPA
Developer
ACE DevCo NC, LLC
Connection point (POI)
Edwards Avenue 138 kV Substation
Location
Suffolk County, New York
Technology
Battery: 200 MW
Total requested
200 MW
Queue status
Withdrawn
Entered queue
6 July 2023

Location

Marker shows the centre of Suffolk County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Suffolk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem