United States βΊ Grid βΊ Interconnection queues βΊ New York
SOLAR Β· NYISOGillie Brook Solar
Gillie Brook Solar is a 200 MW solar request withdrawn in the NYISO interconnection queue, in Onondaga County, New York, connecting to NM-NG.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1577
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- ACE DevCo NC, LLC
- Connection point (POI)
- Elbridge 115 kV Substation
- Location
- Onondaga County, New York
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Queue status
- Withdrawn
- Entered queue
- 6 July 2023
Location
Marker shows the centre of Onondaga County; the queue data does not give exact sites.
Other requests in Onondaga County
- Maple Harvest WindOnshore wind Β· 162 MW Β· in study
- Sky High SolarSolar Β· 20.0 MW Β· in study
- Mill Run BESSBattery storage Β· 260 MW Β· withdrawn
- Icebox Energy StorageBattery storage Β· 202 MW Β· withdrawn
- Cassiopeia Energy CenterBattery storage Β· 200 MW Β· withdrawn
- ELP Clay StorageBattery storage Β· 199 MW Β· withdrawn
- ELP Clay StorageBattery storage Β· 165 MW Β· withdrawn
- Zenith BESSBattery storage Β· 165 MW Β· withdrawn
- Eastwater Energy StorageBattery storage Β· 101 MW Β· withdrawn
- Three Rivers Energy StorageBattery storage Β· 80.0 MW Β· withdrawn
- Syracuse Energy StorageBattery storage Β· 79.0 MW Β· withdrawn
- Ripley HillOnshore wind Β· 75.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem