United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOBPP NY Somerset BESS I LLC
BPP NY Somerset BESS I LLC is a 200 MW battery storage request withdrawn in the NYISO interconnection queue, in Niagara County, New York, connecting to NYSEG.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- C24-091
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- BPP NY Somerset BESS I LLC
- Connection point (POI)
- Kintigh 345kV
- Location
- Niagara County, New York
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Queue status
- Withdrawn
- Entered queue
- 19 August 2024
Location
Marker shows the centre of Niagara County; the queue data does not give exact sites.
Other requests in Niagara County
- Erie Canal BESSBattery storage · 230 MW · in study
- Lockport StorageBattery storage · 180 MW · in study
- Somerset SolarSolar · 125 MW · in study
- Buffalo Road Energy StorageBattery storage · 100 MW · in study
- Bear Ridge SolarSolar · 100 MW · in study
- Riverbank Power ABattery storage · 1,000 MW · withdrawn
- HuntleyGas · 752 MW · withdrawn
- SomersetCoal · 706 MW · withdrawn
- Ridge View Solar Energy CenterSolar · 350 MW · withdrawn
- Erie Canal BESSBattery storage · 230 MW · withdrawn
- Erie Canal BESSBattery storage · 230 MW · withdrawn
- Lighthouse WindOnshore wind · 201 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem