United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOBPP NY Lansing BESS I
BPP NY Lansing BESS I is a 200 MW battery storage request withdrawn in the NYISO interconnection queue, in Tompkins County, New York, connecting to NYSEG.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1585
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- Bear Peak Power LLC
- Connection point (POI)
- Milliken 115 kV Substation
- Location
- Tompkins County, New York
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Queue status
- Withdrawn
- Entered queue
- 31 July 2023
Location
Marker shows the centre of Tompkins County; the queue data does not give exact sites.
Other requests in Tompkins County
- BPP NY Lansing BESS IBattery storage · 200 MW · in study
- Yellow Barn SolarSolar · 160 MW · in study
- Cayuga SolarSolar · 60.0 MW · in study
- Troy Heights Energy StorageBattery storage · 40.0 MW · in study
- Cayuga SolarSolar · 207 MW · withdrawn
- Yellow Barn SolarSolar · 160 MW · withdrawn
- Silverline Energy CenterSolar + storage · 150 MW · withdrawn
- Argos SolarSolar · 150 MW · withdrawn
- Silverline Energy CenterSolar + storage · 150 MW · withdrawn
- Queen Energy CenterBattery storage · 140 MW · withdrawn
- Cayuga SolarSolar · 100 MW · withdrawn
- Black Oak WindOnshore wind · 50.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem