United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOSouthern Tier Energy Center
Southern Tier Energy Center is a 200 MW battery storage request withdrawn in the NYISO interconnection queue, in Tioga County, New York, connecting to NYSEG.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2022 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1177
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- Southern Tier Energy Center, LLC
- Connection point (POI)
- Oakdale to Watercure 345 kV L31 line
- Location
- Tioga County, New York
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Queue status
- Withdrawn
- Entered queue
- 16 August 2022
Location
Marker shows the centre of Tioga County; the queue data does not give exact sites.
Other requests in Tioga County
- Southern Tier Energy CenterBattery storage · 200 MW · in study
- Valley SolarSolar · 20.0 MW · in study
- Tioga County EnergyGas · 700 MW · withdrawn
- Endless Mountain WindOnshore wind · 150 MW · withdrawn
- Dean WindOnshore wind · 150 MW · withdrawn
- Canfield WindOnshore wind · 120 MW · withdrawn
- Sidecar SolarSolar · 100 MW · withdrawn
- SidecarSolar · 50.0 MW · withdrawn
- Owego SolarSolar · 20.0 MW · withdrawn
- CDG Owego 2, LLCSolar · 19.6 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem