SOLAR Β· NYISO

Sidecar Solar

Sidecar Solar is a 100 MW solar request withdrawn in the NYISO interconnection queue, in Tioga County, New York, connecting to NYSEG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1492
Grid region
NYISO (New York)
Utility / transmission owner
NYSEG
Developer
ACE DevCo NC, LLC
Connection point (POI)
115 kV South Owego Substation
Location
Tioga County, New York
Technology
Solar: 100 MW
Total requested
100 MW
Queue status
Withdrawn
Entered queue
22 December 2022

Location

Marker shows the centre of Tioga County; the queue data does not give exact sites.

Power plants in New York Β· Transmission lines in New York

Other requests in Tioga County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem