United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Queue requests in study in ERCOT (Texas) — page 8

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,408328.0 GW
Active in queue447.3 GW1,986 requests
Agreement signed119.3 GW578 requests
Withdrawn1,158262.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,408 requests · page 8 of 29
ProjectCapacityStatusLocationRegionQueuedOnline
Charolais Solar
Solar + storage · RWE Solar Development, LLC
262 MWIn study Matagorda, TXERCOT Aug 2019target 2026
Velociraptor BESS II
Solar + storage · Greyhound BESS 3 LLC
261 MWIn study Ector, TXERCOT May 2025target 2028
Velociraptor BESS I
Solar + storage · Greyhound BESS 2 LLC
261 MWIn study Ector, TXERCOT May 2025target 2028
Verily Solar (FKA Cuello De Cuero Solar)
Solar · NextEra Energy Interconnection Holdings, LLC
261 MWIn study Brooks, TXERCOT Mar 2024target 2029
Homestead Power (TEF-Due Diligence)
Gas · Homestead Power LLC
260 MWIn study Austin, TXERCOT Jul 2024target 2029
Ochoa Energy Storage
Battery storage · Ochoa Energy Storage LLC
260 MWIn study Waller, TXERCOT Apr 2023target 2027
Jay Flat BESS
Battery storage · Jay Flat BESS LLC
259 MWIn study Kent, TXERCOT Jan 2025target 2029
Horsepower BESS
Battery storage · Horsepower BESS, LLC
258 MWIn study Bexar, TXERCOT Dec 2025target 2028
Masava Storage
Battery storage · Savannah Oaks Solar Project, LLC
257 MWIn study Madison, TXERCOT Sep 2022target 2028
Saddlehorn Energy Storage
Battery storage · Saddlehorn, LLC
257 MWIn study Austin, TXERCOT Nov 2024target 2028
Van Zandt Energy Storage
Battery storage · Rocky Mountain Energy Holdings, LLC
257 MWIn study Ector, TXERCOT Jun 2023target 2027
Shamrock II Wind
Onshore wind
257 MWPaused / redesign Crockett, TXERCOT Jul 2023target 2028
Rex Storage
Battery storage · Rex BESS, LLC
256 MWIn study Harris, TXERCOT Jun 2024target 2027
Bell County Morgan Storage
Battery storage · DM-BCTRM, LLC
256 MWIn study Bell, TXERCOT Nov 2024target 2028
Sunburst BESS
Solar + storage · Indigo Solar, LLC
256 MWIn study San Patricio, TXERCOT Oct 2024target 2029
Nautilus Heavy Storage
Battery storage · Nautilus Heavy Storage, LLC
256 MWIn study San Patricio, TXERCOT Dec 2023target 2028
Leaning Tree BESS
Battery storage
256 MWPaused / redesign Throckmorton, TXERCOT Nov 2023target 2026
Maleza Storage II
Battery storage · Brush Storage, LLC
256 MWIn study Wharton, TXERCOT Feb 2024target 2027
Lonesome Dove BESS
Battery storage
256 MWPaused / redesign Throckmorton, TXERCOT Nov 2023target 2026
Champs Elysees BESS
Battery storage · Champs Elysees Renewables, LLC
256 MWIn study Milam, TXERCOT Aug 2024target 2027
Nouveau BESS
Battery storage · RamZ BESS, LLC
256 MWIn study Brown, TXERCOT Aug 2024target 2027
Bayou Creek Solar
Solar · Ferrovial Energy US 1
256 MWIn study San Patricio, TXERCOT Dec 2024target 2028
Sierra Madre Solar
Solar · Sierra Madre Solar LLC
255 MWIn study Zapata, TXERCOT Jan 2020target 2027
San Gabriel Solar
Solar + storage · San Gabriel Solar LLC
255 MWIn study Milam, TXERCOT Jan 2025target 2028
Maleza Solar II
Solar + storage · Brush Solar, LLC
255 MWIn study Wharton, TXERCOT Apr 2021target 2027
PowerVault BESS
Battery storage · SMT Elm Mott BESS
255 MWIn study Mclennan, TXERCOT Mar 2024target 2027
Railway BESS
Battery storage
255 MWPaused / redesign Rusk, TXERCOT Jan 2023target 2026
Staked Plains BESS
Battery storage
255 MWPaused / redesign Lubbock, TXERCOT Mar 2023target 2026
Grand Mesa BESS
Battery storage · PERRY GREEN POWER LLC
253 MWIn study Pecos, TXERCOT Aug 2024target 2027
Collier Ranch Solar
Solar
253 MWPaused / redesign Motley, TXERCOT Feb 2024
Armstrong Wind
Onshore wind · Big Sky Energy
253 MWPaused / redesign Armstrong, TXERCOT May 2016target 2020
Bayside II Solar
Solar
253 MWPaused / redesign Dewitt, TXERCOT Jul 2021target 2026
Tall Saddle Solar
Solar · Tall Saddle Solar, LLC
252 MWIn study Kenedy, TXERCOT Jul 2024target 2029
Bayside 2 BESS
Battery storage
252 MWPaused / redesign Dewitt, TXERCOT Mar 2022
Lazy U Solar 2
Solar · Lazy U Solar 2
252 MWIn study Hardeman, TXERCOT Aug 2023target 2029
Pandora Solar
Solar
252 MWPaused / redesign Wilson, TXERCOT Jan 2020
Little Ridge Storage
Battery storage · TX BESS B LLC
252 MWIn study Collin, TXERCOT May 2023target 2025
Lazy U Solar 1
Solar · Lazy U Solar 1
252 MWIn study Hardeman, TXERCOT Aug 2023target 2029
Straight Spur Solar
Solar + storage · ENGIE IR Holdings LLC
252 MWIn study Andrews, TXERCOT Nov 2024target 2029
Velociraptor Solar II
Solar + storage · Greyhound Solar 3 LLC
252 MWIn study Ector, TXERCOT May 2025target 2028
Velociraptor Solar I
Solar + storage · Greyhound Solar 2
252 MWIn study Ector, TXERCOT May 2019target 2028
Ogalalla Storage
Battery storage · Hecate Energy Ogalalla Solar LLC
252 MWIn study Castro, TXERCOT Jan 2024target 2028
Paint Brush PV2
Solar · Renew Development HoldCo LLC
252 MWIn study Coleman, TXERCOT Dec 2025target 2028
Juniper Ridge BESS 2
Battery storage · Lazy U ESS 2
252 MWIn study Hardeman, TXERCOT Aug 2023target 2029
Paint Brush PV3
Solar · Renew Development HoldCo LLC
252 MWIn study Coleman, TXERCOT Dec 2025target 2029
Cowboy Power Gas Plant
Gas · Vaquero Power, LLC
252 MWIn study San Patricio, TXERCOT Aug 2025target 2028
Paint Brush PV4
Solar · Renew Development HoldCo LLC
252 MWIn study Coleman, TXERCOT Dec 2025target 2029
Paint Brush PV1
Solar · Renew Development HoldCo LLC
252 MWIn study Coleman, TXERCOT Dec 2025target 2028
Juniper Ridge BESS 1
Battery storage · Lazy U ESS 1
252 MWIn study Hardeman, TXERCOT Sep 2023target 2029
Buffalo Meadow Solar
Solar + storage · Buffalo Meadow Energy Center, LLC
251 MWIn study Robertson, TXERCOT Feb 2023target 2028
Page 8 of 29

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)