United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in the USA — page 65
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar + storage project G1029, Benton County Solar + storage |
188 MW | In study |
| Gas project ERAS-2025-003, Oklahoma County Gas |
186 MW | In study |
| Solar project J2937, Montgomery County Solar |
186 MW | In study |
| Serrano Storage Battery storage · Maverick ESS, LLC |
186 MW | In study |
| Wetzel BESS Battery storage · Brown ESS, LLC |
186 MW | In study |
| Solar project 267, Saluda County Solar |
186 MW | In study |
| Montezuma Storage Battery storage · Montezuma Storage LLC |
185 MW | In study |
| Solar project J4023, Clay County Solar |
185 MW | In study |
| Solar project J1944, Sanilac County Solar |
185 MW | In study |
| Gas project T2-035, Millard County Gas |
185 MW | In study |
| Solar project J2237, Lee County Solar |
185 MW | In study |
| Solar project J1518, Vermillion County Solar |
185 MW | In study |
| Solar project AH1-272, Van Buren County Solar · Bankson Solar Project, LLC |
185 MW | In study |
| Solar project AH2-168, Madison County Solar |
185 MW | In study |
| Solar project J1851, Morehouse Parish County Solar |
185 MW | In study |
| Solar project J3903, Mower County Solar |
185 MW | In study |
| Los Vientos IB Repower Onshore wind · Los Vientos Windpower IB, LLC |
185 MW | In study |
| Malachite Solar Solar + storage · Malachite Solar LLC |
185 MW | In study |
| Maldives Solar (Oncor POI) Solar |
184 MW | Paused / redesign |
| Cairos Storage 2 Battery storage · Cairos Solar, LLC |
184 MW | In study |
| Jalisco Peaker Gas · HEP Power Generation, LLC |
184 MW | In study |
| Battery storage project GEN-2025-SR14, Oklahoma County Battery storage |
183 MW | In study |
| Beaver Creek Solar Solar + storage |
183 MW | In study |
| Basketflower Solar Solar + storage · Basketflower Solar, LLC |
183 MW | In study |
| Battery storage project J4087, Blue Earth County Battery storage |
183 MW | In study |
| Solar project GEN-2021-108, Cass County Solar |
182 MW | In study |
| Lan Solar SLF Solar + storage · BR Solar, LLC |
182 MW | In study |
| Solar + storage project AI1-212, Jefferson County Solar + storage |
182 MW | In study |
| Onshore wind project GI-1502, Stark County Onshore wind |
182 MW | In study |
| Caesar Solar Solar + storage · Caesar Solar, LLC |
182 MW | In study |
| Nanulak BESS Battery storage · Nanulak BESS, L.L.C. |
182 MW | In study |
| Oak Belt Solar Solar + storage · Oak Belt Solar, LLC |
181 MW | In study |
| Turkey Creek Solar SLF Solar + storage · Greenray Solar Corporation |
181 MW | In study |
| Frizzle BESS Battery storage · Frizzle BESS, L.L.C. |
181 MW | In study |
| Hofbrau BESS Battery storage · Momentum Hofbrau LLC |
181 MW | In study |
| Amphion Solar Phase 1 Solar · Amphion Solar, LLC |
181 MW | In study |
| Alliance Solar Solar |
180 MW | Paused / redesign |
| Solar + storage project AH2-153, Vermillion County Solar + storage |
180 MW | In study |
| Onshore wind project J2965, Morehouse Parish County Onshore wind |
180 MW | In study |
| Horseshoe Solar Solar · Horseshoe Solar Energy LLC |
180 MW | In study |
| Amberjack2 BESS Battery storage · Hunt Energy Network, LLC |
180 MW | In study |
| Indigo solar 2 Solar + storage · Indigo Solar 2 |
180 MW | In study |
| Solar project GEN-2023-205, Hughes County Solar |
180 MW | In study |
| Battery storage project GEN-2022-136, Bryan County Battery storage |
180 MW | In study |
| Battery storage project J3782, Saginaw County Battery storage |
180 MW | In study |
| Onshore wind project J3448, Grant County Onshore wind |
180 MW | In study |
| Solar + storage project AH2-373, Berrien County Solar + storage |
180 MW | In study |
| Battery storage project AH2-423, Calvert County Battery storage |
180 MW | In study |
| Elevate Arthur Kill II Battery storage · Lighthouse Arthur Kill II, LLC |
180 MW | In study |
| Whitetail BESS Battery storage · Hunt Energy Network, LLC |
180 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)