United States › Grid › Interconnection queues › Georgia
SOLAR + STORAGE · SOUTHEASTBeaver Creek Solar
Beaver Creek Solar is a 183 MW solar + storage request in interconnection study in the Southeast interconnection queue, in Baldwin County, Georgia, connecting to Georgia Transmission.
Queue statusIn planning
- PlanningQueued Sep 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Apr 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GI-184
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Georgia Transmission
- Connection point (POI)
- Gordon - Milledgeville (White) 115 kV TL
- Location
- Baldwin County, Georgia
- Technology
- Solar: 183 MW · Battery
- Total requested
- 183 MW
- Study phase
- Facilities Study
- Queue status
- Active
- Entered queue
- 20 September 2023
- Proposed online date
- April 2027
Location
Marker shows the centre of Baldwin County; the queue data does not give exact sites.
Other requests in Baldwin County
- Solar project IC-1142, Baldwin CountySolar · 183 MW · agreement signed
- Gas project IC-109, Baldwin CountyGas · 556 MW · withdrawn
- Gas project IC-228, Baldwin CountyGas · 520 MW · withdrawn
- Solar project IC-799, Baldwin CountySolar · 150 MW · withdrawn
- Solar project IC-389, Baldwin CountySolar · 18.4 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem