United States › Grid › Interconnection queues › Georgia

SOLAR + STORAGE · SOUTHEAST

Beaver Creek Solar

Beaver Creek Solar is a 183 MW solar + storage request in interconnection study in the Southeast interconnection queue, in Baldwin County, Georgia, connecting to Georgia Transmission.

Queue statusIn planning
  1. PlanningQueued Sep 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Apr 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GI-184
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Georgia Transmission
Connection point (POI)
Gordon - Milledgeville (White) 115 kV TL
Location
Baldwin County, Georgia
Technology
Solar: 183 MW · Battery
Total requested
183 MW
Study phase
Facilities Study
Queue status
Active
Entered queue
20 September 2023
Proposed online date
April 2027

Location

Marker shows the centre of Baldwin County; the queue data does not give exact sites.

Power plants in Georgia · Transmission lines in Georgia

Other requests in Baldwin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem