United States โบ Grid โบ Interconnection queues
OCTARY USA ยท INTERCONNECTION QUEUESQueue requests in study in the USA (2023 requests) โ page 5
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Other project G0892, Linn County Other |
400 MW | In study |
| Battery storage project G0862, Sherman County Battery storage |
400 MW | In study |
| Solar + storage project Company OU, Lander County Solar + storage |
400 MW | Paused / redesign |
| Solar + storage project G0909, Deschutes County Solar + storage |
400 MW | In study |
| Onshore wind project G0956, Benewah County Onshore wind |
400 MW | In study |
| Comstock Gas |
398 MW | In study |
| Battery storage project GI-2023-168, Imperial County Battery storage |
387 MW | In study |
| MidBishop Solar + storage |
382 MW | In study |
| Solar + storage project Company OI, Esmeralda County Solar + storage |
380 MW | In study |
| Brown Bear Solar + storage |
378 MW | In study |
| Circinus Solar + storage |
371 MW | In study |
| Scott Crossing Solar SLF Solar + storage ยท FRESH AIR ENERGY II, LLC |
364 MW | In study |
| Channing Wind Onshore wind |
361 MW | Paused / redesign |
| Onshore wind project GEN-2022-161, Butler County Onshore wind |
360 MW | In study |
| Tetris Solar Solar ยท NextEra Energy Interconnection Holdings LLC |
359 MW | In study |
| Tetris Solar (Alternative POI) Solar |
359 MW | Paused / redesign |
| Funston Solar (AEP POI) Solar |
355 MW | Paused / redesign |
| Battery storage project AJ1-012, Lake County Battery storage |
354 MW | In study |
| Goldlink Solar |
354 MW | In study |
| Bajada Solar |
353 MW | In study |
| Moonraker Battery storage |
353 MW | In study |
| Zama Battery storage |
353 MW | In study |
| Argos Solar Solar |
352 MW | In study |
| Onshore wind project G0955, Lincoln County Onshore wind |
350 MW | In study |
| Gas project Q519, Maricopa County Gas |
350 MW | In study |
| Battery Storage Battery storage |
350 MW | In study |
| Onshore wind project G0954, Lincoln County Onshore wind |
350 MW | In study |
| Titus Low Carbon Ventures Solar 1 Solar ยท Vaquero Solar, LLC |
338 MW | In study |
| Solar project GEN-2023-015, Finney County Solar |
330 MW | In study |
| Battery storage project AJ1-011, Lake County Battery storage |
328 MW | In study |
| Galadriel Battery storage |
318 MW | In study |
| Quaking Aspen Solar + storage |
318 MW | In study |
| Cowboy Solar + storage |
312 MW | In study |
| Bulldog Power (TEF - Due Diligence) Gas ยท Bulldog Power LLC |
311 MW | In study |
| Oak Tree Energy Storage Battery storage ยท Live Oak Energy Storage, LLC |
310 MW | In study |
| Mesquite Solar 6 Solar + storage |
309 MW | In study |
| Buffalo Prairie Storage Solar + storage ยท Buffalo Meadow Energy Center, LLC |
308 MW | In study |
| Jackrabbit Power Bank Battery storage |
308 MW | In study |
| Haute Stockage Battery storage |
307 MW | Paused / redesign |
| Beaujolais BESS Battery storage |
307 MW | Paused / redesign |
| Cuchillas BESS Solar + storage ยท Gransolar Texas Two |
307 MW | In study |
| Green Palms Solar |
307 MW | In study |
| Wolf Hollow III Gas ยท Wolf Hollow II Power LLC |
306 MW | In study |
| Serenity Solar |
305 MW | In study |
| Gosford Solar Storage Solar |
305 MW | In study |
| WOE Gyp King Wind Onshore wind ยท KSK Wind Farm 1, LLC |
304 MW | Paused / redesign |
| Twinkle Battery storage |
304 MW | In study |
| Whitewright Solar 2 Solar ยท SunWR, LLC |
302 MW | In study |
| Amerada Solar Solar + storage ยท Amerada Solar, LLC |
302 MW | In study |
| Riverbend Solar SLF Solar + storage ยท Riverbend Renewables, LLC |
302 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)291 ยท 107.5 GW
- CAISO (California)107 ยท 53.4 GW
- ERCOT (Texas)253 ยท 51.8 GW
- Southeast (non-ISO utilities)157 ยท 17.0 GW
- PJM (Mid-Atlantic, Midwest)156 ยท 14.6 GW
- SPP (Southwest Power Pool)73 ยท 14.1 GW
- MISO (Midcontinent)22 ยท 3,354 MW
- ISO-NE (New England)6 ยท 1,053 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)