BATTERY STORAGE · PJMBattery storage project AJ1-012, Lake County
Battery storage project AJ1-012, Lake County is a 354 MW battery storage request in interconnection study in the PJM interconnection queue, in Lake County, Illinois, connecting to ComEd.
Queue statusIn planning
- PlanningQueued May 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AJ1-012
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Waukegan Unit 8 CIR Transfer
- Location
- Lake County, Illinois
- Technology
- Battery: 354 MW
- Total requested
- 354 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Active
- Entered queue
- 24 May 2023
- Proposed online date
- June 2027
Location
Marker shows the centre of Lake County; the queue data does not give exact sites.
Other requests in Lake County
- Zion Energy Center - BESSBattery storage · 50.0 MW · agreement signed
- Battery storage project AJ1-011, Lake CountyBattery storage · 328 MW · in study
- Zion Energy CenterGas · 585 MW · built
- Countryside LandfillOther · 8.0 MW · built
- Gas project Y2-103, Lake CountyGas · 360 MW · withdrawn
- Gas project X2-019, Lake CountyGas · 225 MW · withdrawn
- Battery storage project AH1-190, Lake CountyBattery storage · 80.0 MW · withdrawn
- Solar project AH1-045, Lake CountySolar · 23.0 MW · withdrawn
- Onshore wind project V3-060, Lake CountyOnshore wind · 20.0 MW · withdrawn
- Other project AB1-079, Lake CountyOther · 6.5 MW · withdrawn
- Other project Q29, Lake CountyOther · 5.4 MW · withdrawn
- Battery storage project AE1-204, Lake CountyBattery storage · 4.4 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem