United States βΊ Grid βΊ Interconnection queues βΊ Illinois
GAS Β· PJMGas project Y2-103, Lake County
Gas project Y2-103, Lake County is a 360 MW gas request withdrawn in the PJM interconnection queue, in Lake County, Illinois, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2012 (completed)
- Withdrawn / abandonedDec 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Y2-103
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Zion Energy Center
- Location
- Lake County, Illinois
- Technology
- Gas: 360 MW
- Total requested
- 360 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 1 November 2012
- Proposed online date
- June 2016
- Withdrawn
- December 2019
Location
Marker shows the centre of Lake County; the queue data does not give exact sites.
Other requests in Lake County
- Zion Energy Center - BESSBattery storage Β· 50.0 MW Β· agreement signed
- Battery storage project AJ1-012, Lake CountyBattery storage Β· 354 MW Β· in study
- Battery storage project AJ1-011, Lake CountyBattery storage Β· 328 MW Β· in study
- Zion Energy CenterGas Β· 585 MW Β· built
- Countryside LandfillOther Β· 8.0 MW Β· built
- Gas project X2-019, Lake CountyGas Β· 225 MW Β· withdrawn
- Battery storage project AH1-190, Lake CountyBattery storage Β· 80.0 MW Β· withdrawn
- Solar project AH1-045, Lake CountySolar Β· 23.0 MW Β· withdrawn
- Onshore wind project V3-060, Lake CountyOnshore wind Β· 20.0 MW Β· withdrawn
- Other project AB1-079, Lake CountyOther Β· 6.5 MW Β· withdrawn
- Other project Q29, Lake CountyOther Β· 5.4 MW Β· withdrawn
- Battery storage project AE1-204, Lake CountyBattery storage Β· 4.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem