United States βΊ Grid βΊ Interconnection queues βΊ Illinois
GAS Β· PJMZion Energy Center
Zion Energy Center is a 585 MW gas request built and operating in the PJM interconnection queue, in Lake County, Illinois, connecting to ComEd.
Request details
- Queue ID
- S55
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Zion 345kV
- Location
- Lake County, Illinois
- Technology
- Gas: 585 MW
- Total requested
- 585 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 6 June 2007
- Proposed online date
- February 2011
- Came online
- December 2011
Location
Marker shows the centre of Lake County; the queue data does not give exact sites.
Other requests in Lake County
- Zion Energy Center - BESSBattery storage Β· 50.0 MW Β· agreement signed
- Battery storage project AJ1-012, Lake CountyBattery storage Β· 354 MW Β· in study
- Battery storage project AJ1-011, Lake CountyBattery storage Β· 328 MW Β· in study
- Countryside LandfillOther Β· 8.0 MW Β· built
- Gas project Y2-103, Lake CountyGas Β· 360 MW Β· withdrawn
- Gas project X2-019, Lake CountyGas Β· 225 MW Β· withdrawn
- Battery storage project AH1-190, Lake CountyBattery storage Β· 80.0 MW Β· withdrawn
- Solar project AH1-045, Lake CountySolar Β· 23.0 MW Β· withdrawn
- Onshore wind project V3-060, Lake CountyOnshore wind Β· 20.0 MW Β· withdrawn
- Other project AB1-079, Lake CountyOther Β· 6.5 MW Β· withdrawn
- Other project Q29, Lake CountyOther Β· 5.4 MW Β· withdrawn
- Battery storage project AE1-204, Lake CountyBattery storage Β· 4.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem