Interconnection queue in PJM (Mid-Atlantic, Midwest) — page 5

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,248140.4 GW
Active in queue140.4 GW1,248 requests
Agreement signed35.0 GW343 requests
Withdrawn5,226638.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,248 requests · page 5 of 25
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project AH1-338, Lee County
Solar · Prairie Brome Solar LLC
180 MWIn study Lee, ILPJM Feb 2025target 2025
Sloopy Solar Energy Center
Solar
180 MWAgreement signed Clark, OHPJM Mar 2019target 2028
Solar project AH1-537, Highland County
Solar · Riverlake Energy, LLC
179 MWIn study Highland, OHPJM Mar 2025target 2025
CPV Backbone Solar
Solar
175 MWAgreement signed Garrett, MDPJM Mar 2020target 2025
Kingwood Solar
Solar
175 MWAgreement signed Greene, OHPJM Sep 2017target 2026
Nuclear project AH1-714, Lasalle County
Nuclear · Constellation Energy Generation, LLC
174 MWIn study Lasalle, ILPJM Apr 2025
Solar + storage project AI1-213, Elk County
Solar + storage
174 MWIn study Elk, PAPJM Sep 2022target 2024
Solar + storage project AH2-258, Kendall County
Solar + storage
172 MWIn study Kendall, ILPJM Mar 2022target 2024
Battery storage project AH2-259, Kendall County
Battery storage
172 MWIn study Kendall, ILPJM Mar 2022target 2024
Mount Storm Repower
Onshore wind · Renew Development Holdco LLC
171 MWIn study Barbour, WVPJM Jan 2025target 2025
Onshore wind project AI1-003, Huntington County
Onshore wind
170 MWIn study Huntington, INPJM Apr 2022target 2026
Battery storage project AH2-204, Stephenson County
Battery storage
170 MWIn study Stephenson, ILPJM Mar 2022target 2026
Lamberton Road Battery
Battery storage
170 MWAgreement signed Mercer, NJPJM Sep 2019target 2027
Battery storage project AI1-156, Kane County
Battery storage
170 MWIn study Kane, ILPJM Sep 2022target 2027
Courthouse Solar
Solar · Virginia Electric and Power Company (d/b/a Dominion Energy Virginia)
167 MWIn study Charlotte, VAPJM Mar 2020target 2031
Solar project AI1-148, Kankakee County
Solar
164 MWIn study Kankakee, ILPJM Sep 2022target 2026
Solar project AI2-028, Union County
Solar
160 MWIn study Union, OHPJM Dec 2022target 2026
Golden Aster Solar Energy Center
Solar
160 MWPaused / redesign Grant, INPJM Sep 2018target 2026
Erie East Energy
Battery storage
160 MWPaused / redesign Erie, PAPJM Mar 2019target 2026
Solar project AH2-338, Winnebago County
Solar
160 MWIn study Winnebago, ILPJM Mar 2022target 2027
Gas project AH1-722, Union County
Gas · Parkway Generation Operating LLC
158 MWIn study Union, NJPJM Apr 2025
Solar + storage project AH1-543, Livingston County
Solar + storage · Golden Harvest Energy, LLC
157 MWIn study Livingston, ILPJM Feb 2025target 2025
Solar project AI1-137, Warren County
Solar
155 MWIn study Warren, NJPJM Sep 2022target 2025
Skycrest Solar Energy Center
Solar
155 MWAgreement signed Jay, INPJM Feb 2019target 2026
Springwater Solar
Solar
155 MWAgreement signed Madison, OHPJM Sep 2019target 2027
Battery storage project AH2-376, Whiteside County
Battery storage
153 MWIn study Whiteside, ILPJM Mar 2022target 2027
Blackford Solar Energy Project
Solar
150 MWAgreement signed Jay, INPJM Sep 2019target 2026
Battery storage project AI2-045, City Of Virginia Beach County
Battery storage
150 MWIn study City Of Virginia Beach, VAPJM Feb 2023target 2023
Battery storage project AH2-377, Grundy County
Battery storage
150 MWIn study Grundy, ILPJM Mar 2022target 2024
Battery storage project AI2-456, King George County
Battery storage
150 MWIn study King George, VAPJM Mar 2023target 2027
Solar project AG2-230, St. Joseph County
Solar · Dumont Solar, LLC
150 MWIn study St. Joseph, INPJM Mar 2025target 2024
Harvey Solar I
Solar
150 MWAgreement signed Licking, OHPJM Mar 2018target 2028
Wild Grains Solar
Solar
150 MWAgreement signed Van Wert, OHPJM Oct 2019target 2027
Battery storage project AI2-071, Atlantic County
Battery storage
150 MWIn study Atlantic, NJPJM Feb 2023target 2027
French Creek Solar and BESS
Solar + storage · French Creek Energy, LLC
150 MWAgreement signed Erie, PAPJM Sep 2020target 2029
Battery storage project AI2-001, Caroline County
Battery storage
150 MWIn study Caroline, VAPJM Oct 2022target 2028
Energy Mountain
Battery storage
150 MWPaused / redesign Bucks, PAPJM Mar 2018target 2029
Battery storage project AH2-077, Sussex County
Battery storage
150 MWIn study Sussex, DEPJM Jan 2022target 2027
Solar project AG2-176, Crawford County
Solar · Trestle Solar Farm, LLC
150 MWIn study Crawford, PAPJM Mar 2025target 2024
Spring Grove Solar II
Solar
150 MWAgreement signed Surry, VAPJM Jun 2017target 2025
Palomino Solar
Solar
150 MWAgreement signed Highland, OHPJM Aug 2020target 2027
Blue Ridge Solar
Solar
150 MWAgreement signed Pittsylvania, VAPJM Aug 2018target 2028
Solar + storage project AH2-021, Barren County
Solar + storage
150 MWIn study Barren, KYPJM Oct 2021target 2026
Aurora Battery Storage II
Battery storage · Aurora Generation, LLC
150 MWIn study ILPJM Feb 2025target 2025
Shawboro Solar
Solar
150 MWAgreement signed Currituck, NCPJM Jul 2018target 2027
Pulaski Solar
Solar
150 MWAgreement signed Pulaski, VAPJM Jan 2020target 2028
Solar + storage project AI2-446, Cambria County
Solar + storage
150 MWIn study Cambria, PAPJM Mar 2023target 2027
Bowfin Solar
Solar + storage
150 MWPaused / redesign Huntington, INPJM Aug 2019target 2028
Bright Stalk Generating Facility
Onshore wind · Lexington Chenoa Wind Farm LLC
150 MWIn study Mclean, ILPJM Mar 2019target 2022
Solar project AH2-350, Cumberland County
Solar
150 MWIn study Cumberland, VAPJM Mar 2022target 2025
Page 5 of 25

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)