United States › Grid › Interconnection queues › Ohio
SOLAR · PJMKingwood Solar
Kingwood Solar is a 175 MW solar request with a signed interconnection agreement in the PJM interconnection queue, in Greene County, Ohio, connecting to ATSI.
Queue statusConsented
- PlanningQueued Sep 2017 (completed)
- ConsentedSep 2021 (current stage)
- Construction (not yet reached)
- OperatingTarget Sep 2026 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- AD1-140
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Connection point (POI)
- Greene-Clark 138 kV
- Location
- Greene County, Ohio
- Technology
- Solar: 175 MW
- Total requested
- 175 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Active
- Entered queue
- 29 September 2017
- Agreement signed
- 17 September 2021
- Proposed online date
- September 2026
Location
Marker shows the centre of Greene County; the queue data does not give exact sites.
Other requests in Greene County
- Solar + storage project AH2-093, Greene CountySolar + storage · 32.0 MW · in study
- Dovetail Biogas FacilityOther · 0.9 MW · built
- Other project G071, Greene CountyOther · 41.0 MW · withdrawn
- Solar project AG1-231, Greene CountySolar · 20.0 MW · withdrawn
- Solar project AH2-029, Greene CountySolar · 18.0 MW · withdrawn
- Dovetail Biogas FacilityOther · 0.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem