SOLAR Β· PJMSolar project AH2-029, Greene County
Solar project AH2-029, Greene County is a 18.0 MW solar request withdrawn in the PJM interconnection queue, in Greene County, Ohio, connecting to Dayton.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2021 (completed)
- Withdrawn / abandonedOct 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH2-029
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dayton
- Connection point (POI)
- Cedarville 12 kV
- Location
- Greene County, Ohio
- Technology
- Solar: 18.0 MW
- Total requested
- 18.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 2 November 2021
- Proposed online date
- October 2025
- Withdrawn
- October 2023
Location
Marker shows the centre of Greene County; the queue data does not give exact sites.
Other requests in Greene County
- Kingwood SolarSolar Β· 175 MW Β· agreement signed
- Solar + storage project AH2-093, Greene CountySolar + storage Β· 32.0 MW Β· in study
- Dovetail Biogas FacilityOther Β· 0.9 MW Β· built
- Other project G071, Greene CountyOther Β· 41.0 MW Β· withdrawn
- Solar project AG1-231, Greene CountySolar Β· 20.0 MW Β· withdrawn
- Dovetail Biogas FacilityOther Β· 0.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem