United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in ERCOT (Texas) (2025 requests) — page 5
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Goat Mountain BESS Wind + storage · Goat Wind LLC |
201 MW | In study |
| Dahlia Solar Solar · Dahlia Energy LLC |
201 MW | In study |
| Oakley BESS Battery storage · Oakley BESS LLC |
201 MW | In study |
| Zunkerville Solar Solar + storage · Zunkerville Energy, LLC |
201 MW | In study |
| Obbligato BESS Battery storage · Obbligato BESS, LLC |
201 MW | In study |
| Arpeggio BESS Battery storage · Arpeggio BESS, LLC |
201 MW | In study |
| Dilley Solar Solar · AETS Development Holdings LLC |
201 MW | In study |
| Ruedrich BESS Battery storage · Ruedrich BESS |
201 MW | In study |
| Devine Mary BESS Battery storage · Devine Mary BESS |
201 MW | In study |
| Englehardt BESS Battery storage · Comal BESS LLC |
201 MW | In study |
| Barbara BESS Battery storage · Barbara BESS LLC |
201 MW | In study |
| Reunion Storage Solar + storage · Reunion Solar, LLC |
200 MW | In study |
| Sagebrush Wind Onshore wind · ACE DevCo NC, LLC |
200 MW | In study |
| Rattlesnake Gap Wind SLF Onshore wind · ET Fuels US Inc. |
200 MW | In study |
| Kresge Land Battery Storage Battery storage · Kresge Land Battery Storage LLC |
200 MW | In study |
| Pasture Rose Wind Onshore wind · Pasture Rose, LLC |
199 MW | In study |
| Barrosos Creek Wind 3 Onshore wind · Cascabel Wind Energy, LLC |
198 MW | In study |
| Barrosos Creek Wind 4 Onshore wind · Cascabel Wind Energy, LLC |
198 MW | In study |
| Wood Fern Wind Onshore wind · Wood Fern Wind LLC |
197 MW | In study |
| Corralitos Wind 3 Onshore wind · Las Crestas Wind Energy, LLC |
196 MW | In study |
| Corralitos Wind 4 Onshore wind · Las Crestas Wind Energy, LLC |
195 MW | In study |
| Pecos Wind Wind + storage · Midnight Energy Center, LLC |
191 MW | In study |
| Montezuma Storage Battery storage · Montezuma Storage LLC |
185 MW | In study |
| Caesar Solar Solar + storage · Caesar Solar, LLC |
182 MW | In study |
| Oak Belt Solar Solar + storage · Oak Belt Solar, LLC |
181 MW | In study |
| Frizzle BESS Battery storage · Frizzle BESS, L.L.C. |
181 MW | In study |
| Amberjack2 BESS Battery storage · Hunt Energy Network, LLC |
180 MW | In study |
| Green Ocelot Storage Solar + storage · Ocelot Solar LLC |
179 MW | In study |
| Eligius BESS Battery storage · Eligius Storage LLC |
175 MW | In study |
| Bell Song Solar 2 Solar · Bell Song Solar, LLC 2 |
168 MW | In study |
| Bell Song Solar 3 Solar · Bell Song Solar, LLC_3 |
168 MW | In study |
| Bell Song Solar Solar · Bell Song Solar, LLC |
168 MW | In study |
| Solgen Solar Solar + storage · Lampasas Hybrid Energy |
160 MW | In study |
| Firefly Fields Storage Solar + storage · Firefly Fields Energy Center LLC |
157 MW | In study |
| Chimney Rock BESS Battery storage · Taylor ESS, LLC |
156 MW | In study |
| Ranger BESS Battery storage · Nova Clean Energy LLC |
155 MW | In study |
| Dorsey Road BESS Battery storage · Horizon Energy Storage Greenfield Project Holdings LLC |
155 MW | In study |
| Berryman Road Storage Battery storage · Horizon Energy Storage Greenfield Project Holdings LLC |
155 MW | In study |
| Bastion BESS Battery storage · BESS BASTION LLC |
154 MW | In study |
| Valcrest BESS Battery storage · Flexen USA LLC |
154 MW | In study |
| Pavo Creek Storage Battery storage · Pavo Creek Storage, LLC |
154 MW | In study |
| Badger BESS Solar + storage · Greasewood BESS, LLC |
154 MW | In study |
| Palisade BESS Battery storage · Flexen USA LLC |
154 MW | In study |
| Damia Storage Solar + storage · Damia Solar, LLC |
153 MW | In study |
| Jaguarundi Energy Storage Battery storage · PowerPulse LLC |
152 MW | In study |
| Kuy Creek Storage 1 SLF Solar + storage · Kuy Creek Storage 1 LLC |
152 MW | In study |
| GPlains Solar Solar + storage · Gypsum Plains Solar, LLC |
151 MW | In study |
| Field Marshal Storage Battery storage · Field Marshal Storage LLC |
151 MW | In study |
| Pecan Ridge Battery storage · Luminous Energy Renewables LLC |
151 MW | In study |
| Greyhound Solar - Phase E Solar · ROCKHOUND SOLAR 2 LLC DBA GREYHOUND SOLAR |
151 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)390 · 120.8 GW
- ERCOT (Texas)361 · 104.0 GW
- West (non-ISO utilities)325 · 84.1 GW
- SPP (Southwest Power Pool)268 · 71.3 GW
- Southeast (non-ISO utilities)264 · 42.0 GW
- PJM (Mid-Atlantic, Midwest)228 · 29.8 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)