United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in CAISO (California) — page 5

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown429188.6 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

429 requests · page 5 of 9
ProjectCapacityStatusLocationRegionQueuedOnline
Haven Storage
Battery storage
313 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2031
Roadhouse Storage
Battery storage
313 MWAgreement signed San Bernardino, CACAISO Apr 2020target 2027
East Field Energy Storage
Battery storage
313 MWAgreement signed San Diego, CACAISO Apr 2020target 2030
Bell Bluff Storage
Battery storage
313 MWIn study San Diego, CACAISO Apr 2021target 2035
Cowboy
Solar + storage
312 MWIn study Colusa, CACAISO Apr 2023target 2030
Key Storage 1
Battery storage
309 MWAgreement signed Fresno, CACAISO Apr 2018target 2026
Mesquite Solar 6
Solar + storage
309 MWIn study Maricopa, AZCAISO Apr 2023target 2028
Harmony Storage 2
Battery storage
308 MWIn study Contra Costa, CACAISO Apr 2021target 2031
Jackrabbit Power Bank
Battery storage
308 MWIn study Santa Clara, CACAISO Apr 2023target 2029
Juniper Storage
Solar + storage
307 MWIn study Los Angeles, CACAISO Apr 2021target 2033
Green Palms
Solar
307 MWIn study Riverside, CACAISO Apr 2023target 2030
Winston Hybrid PV And BESS
Solar + storage
306 MWAgreement signed Kern, CACAISO Apr 2020target 2028
Serenity
Solar
305 MWIn study Nye, NVCAISO Apr 2023target 2031
Humidor Storage 1
Battery storage
305 MWAgreement signed Los Angeles, CACAISO Apr 2019target 2028
Gosford Solar Storage
Solar
305 MWIn study Kern, CACAISO Apr 2023target 2029
Gnarly Osage
Battery storage
304 MWIn study San Diego, CACAISO Apr 2021target 2027
Twinkle
Battery storage
304 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Roccasecca BESS
Battery storage
303 MWAgreement signed Clark, NVCAISO May 2016target 2026
Elion Energy Storage
Battery storage
302 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2034
Tyrell Energy Storage
Battery storage
302 MWAgreement signed Orange, CACAISO Apr 2021target 2032
Tabla Energy Storage
Battery storage
302 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2032
Overnight Solar
Solar + storage
300 MWAgreement signed San Bernardino, CACAISO Apr 2020target 2027
Desert Sands
Battery storage
300 MWAgreement signed Riverside, CACAISO Apr 2020target 2035
Bellefield 3 Solar Farm
Solar + storage
300 MWAgreement signed Kern, CACAISO Apr 2020target 2027
Nighthawk Storage
Battery storage
300 MWAgreement signed San Diego, CACAISO Apr 2019target 2026
Electron
Battery storage
300 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2033
Tahoe
Battery storage
300 MWAgreement signed Clark, NVCAISO May 2016target 2026
Carmine
Battery storage
292 MWIn study Riverside, CACAISO Apr 2021target 2031
Wright Solar
Solar + storage
280 MWAgreement signed Merced, CACAISO Mar 2011target 2026
Shoestring
Solar + storage
270 MWIn study Fresno, CACAISO Apr 2023target 2031
Pathfinder Storage
Battery storage
268 MWAgreement signed San Joaquin, CACAISO Apr 2021target 2031
Geras
Solar + storage
268 MWIn study Stanislaus, CACAISO Apr 2023target 2028
J90 Energy Storage
Battery storage
261 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2033
Tule Wind
Wind + storage
259 MWAgreement signed San Diego, CACAISO May 2004target 2030
Fika
Battery storage
259 MWIn study Merced, CACAISO Apr 2023target 2029
Zeitgeist K Energy Center
Battery storage
258 MWIn study San Joaquin, CACAISO Apr 2023target 2030
Annapurna
Battery storage
257 MWIn study Merced, CACAISO Apr 2023target 2028
Captiva Energy Storage
Battery storage
257 MWAgreement signed Orange, CACAISO Apr 2020target 2028
Delamar Energy Storage 2
Battery storage
256 MWIn study Clark, NVCAISO Apr 2021target 2027
Commerce Energy Storage 3
Battery storage
256 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2031
Almande Energy Storage
Battery storage
256 MWIn study Merced, CACAISO Apr 2021target 2030
Delamar Energy Storage
Battery storage
256 MWAgreement signed Clark, NVCAISO Apr 2020target 2027
Sherman Energy Storage
Battery storage
256 MWIn study Contra Costa, CACAISO Apr 2021target 2031
Gateway Energy Storage 2
Battery storage
256 MWIn study San Diego, CACAISO Apr 2021target 2035
Sandbar Energy Storage
Battery storage
256 MWIn study San Diego, CACAISO Apr 2021target 2030
Ciervo Mountain Hybrid
Solar + storage
255 MWAgreement signed Fresno, CACAISO Apr 2021target 2029
Sandrift Storage 1
Battery storage
255 MWAgreement signed Riverside, CACAISO Apr 2021target 2030
Sandrift Storage 2
Battery storage
255 MWAgreement signed Riverside, CACAISO Apr 2021target 2031
North Rosamond Solar
Solar + storage
253 MWAgreement signed Kern, CACAISO Jul 20102019
Greenwood Energy Storage
Battery storage
252 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2032

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)