United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESBattery storage interconnection queue in the USA — page 39
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Battery storage project S0029, Crook County Battery storage |
60.8 MW | In study |
| Battery storage project AI2-307, Cecil County Battery storage |
60.5 MW | In study |
| Bird Dog Energy Storage Battery storage · VESI 37 LLC |
60.4 MW | Agreement signed |
| Battery storage project J1863, Otsego County Battery storage |
60.0 MW | In study |
| Battery storage project J1880, Ottawa County Battery storage |
60.0 MW | In study |
| Battery storage project J2376, Shelby County Battery storage |
60.0 MW | In study |
| Edwards Calverton Battery Storage Battery storage · Edwards Calverton Battery Storage |
60.0 MW | In study |
| Battery storage project AH2-032, Prince William County Battery storage |
60.0 MW | In study |
| Battery storage project G0708, Morrow County Battery storage |
60.0 MW | In study |
| Battery storage project G0707, Morrow County Battery storage |
60.0 MW | In study |
| Kce NY 21 Battery storage · KCE NY 21, LLC |
60.0 MW | In study |
| Battery storage project GI-2022-161, Imperial County Battery storage |
60.0 MW | In study |
| Battery storage project AH2-033, Prince William County Battery storage |
60.0 MW | In study |
| Battery storage project AI2-231A, Botetourt County Battery storage |
60.0 MW | In study |
| Lafayette Storage Battery storage · Lafayette Energy, LLC |
60.0 MW | In study |
| Battery storage project 376, Yellowstone County Battery storage |
58.8 MW | Paused / redesign |
| Prospect Energy Storage Battery storage |
58.8 MW | Paused / redesign |
| Battery storage project S0014, Washington County Battery storage |
58.0 MW | In study |
| Battery storage project IC-1267, Floyd County Battery storage |
57.5 MW | Agreement signed |
| Luyster Creek Energy Storage 1 Battery storage · Eastern Generation, LLC |
57.3 MW | In study |
| Battery storage project 566170, Wake County Battery storage · Duke Energy Progress, LLC |
56.0 MW | Agreement signed |
| Battery storage project AG2-272, Pittsylvania County Battery storage · Tupelo Storage, LLC |
55.0 MW | In study |
| Hardin Energy Center – Storage II Battery storage |
55.0 MW | Paused / redesign |
| Battery storage project S0030, Crook County Battery storage |
55.0 MW | In study |
| Bluestem Solar Battery storage · RWE Solar Development, LLC |
55.0 MW | In study |
| Battery storage project AH2-061, Prince William County Battery storage |
55.0 MW | In study |
| Battery storage project 313, Williamsburg County Battery storage |
55.0 MW | In study |
| Battery storage project AH2-060, Prince William County Battery storage |
55.0 MW | In study |
| Fighting Jays Battery Battery storage |
53.2 MW | Paused / redesign |
| Battery storage project AH2-145, King George County Battery storage |
52.3 MW | In study |
| Wythe County Solar Project Battery storage |
52.2 MW | Agreement signed |
| Battery storage project GEN-2024-SR13, Bryan County Battery storage |
52.2 MW | In study |
| Clermont County Solar Project Battery storage |
52.2 MW | Paused / redesign |
| Battery storage project AH2-372, Stephenson County Battery storage |
52.0 MW | In study |
| Scafell Storage Battery storage |
52.0 MW | In study |
| Battery storage project GEN-2017-178, Garfield County Battery storage |
52.0 MW | Agreement signed |
| Steppe Reserve Storage Battery storage · KCE TX 25, LLC |
51.9 MW | In study |
| Orchard Ray BESS Battery storage · Pettus BESS |
51.9 MW | In study |
| High Chaparral BESS 138kV Battery storage · High Chaparral Solar Project, LLC |
51.7 MW | Paused / redesign |
| Ryan Energy Storage Battery storage · Ryan Storage LLC |
51.6 MW | Agreement signed |
| Geranium Energy Storage Battery storage |
51.4 MW | In study |
| Ayass BESS Battery storage · Harvick BESS, LLC |
51.3 MW | In study |
| Lumberjack Storage Battery storage · EDP Renewables North America LLC |
50.9 MW | Agreement signed |
| Midpoint Storage Battery storage · Midpoint Solar, LLC |
50.9 MW | Agreement signed |
| Ventasso Energy Storage Battery storage |
50.8 MW | Agreement signed |
| Volunteer Storage Battery storage · Blackjack Storage LLC |
50.6 MW | In study |
| Township Power Bank Battery storage |
50.5 MW | In study |
| Verbena Energy Storage Battery storage |
50.5 MW | In study |
| Albatross BESS Battery storage · Albatross Solar, LLC |
50.4 MW | In study |
| Surfside Energy Storage Battery storage · Rocky Mountain Energy Holdings, LLC |
50.3 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)724 · 133.4 GW
- West (non-ISO utilities)352 · 82.2 GW
- MISO (Midcontinent)305 · 55.0 GW
- CAISO (California)175 · 48.7 GW
- SPP (Southwest Power Pool)198 · 31.4 GW
- PJM (Mid-Atlantic, Midwest)248 · 29.6 GW
- Southeast (non-ISO utilities)109 · 19.4 GW
- NYISO (New York)84 · 11.1 GW
- ISO-NE (New England)31 · 6,907 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)