🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Battery storage interconnection queue in the USA — page 39

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,226417.8 GW
Active in queue417.8 GW2,226 requests
Agreement signed76.1 GW459 requests
Withdrawn3,516554.5 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,226 requests · page 39 of 45
ProjectCapacityStatusLocationRegionQueuedOnline
Battery storage project S0029, Crook County
Battery storage
60.8 MWIn study Crook, ORWest Feb 2024target 2026
Battery storage project AI2-307, Cecil County
Battery storage
60.5 MWIn study Cecil, MDPJM Mar 2023target 2026
Bird Dog Energy Storage
Battery storage · VESI 37 LLC
60.4 MWAgreement signed Live Oak, TXERCOT Feb 2021target 2026
Battery storage project J1863, Otsego County
Battery storage
60.0 MWIn study Otsego, MIMISO Aug 2021target 2024
Battery storage project J1880, Ottawa County
Battery storage
60.0 MWIn study Ottawa, MIMISO Aug 2021target 2024
Battery storage project J2376, Shelby County
Battery storage
60.0 MWIn study Shelby, ILMISO Sep 2022target 2024
Edwards Calverton Battery Storage
Battery storage · Edwards Calverton Battery Storage
60.0 MWIn study Suffolk, NYNYISO Sep 2021target 2026
Battery storage project AH2-032, Prince William County
Battery storage
60.0 MWIn study Prince William, VAPJM Nov 2021target 2026
Battery storage project G0708, Morrow County
Battery storage
60.0 MWIn study Morrow, ORWest Oct 2021target 2023
Battery storage project G0707, Morrow County
Battery storage
60.0 MWIn study Morrow, ORWest Oct 2021target 2023
Kce NY 21
Battery storage · KCE NY 21, LLC
60.0 MWIn study Suffolk, NYNYISO Aug 2024target 2029
Battery storage project GI-2022-161, Imperial County
Battery storage
60.0 MWIn study Imperial, CAWest Sep 2022target 2024
Battery storage project AH2-033, Prince William County
Battery storage
60.0 MWIn study Prince William, VAPJM Nov 2021target 2027
Battery storage project AI2-231A, Botetourt County
Battery storage
60.0 MWIn study Botetourt, VAPJM Mar 2023target 2023
Lafayette Storage
Battery storage · Lafayette Energy, LLC
60.0 MWIn study Fayette, PAPJM Jan 2025target 2024
Battery storage project 376, Yellowstone County
Battery storage
58.8 MWPaused / redesign Yellowstone, MTWest May 2020target 2023
Prospect Energy Storage
Battery storage
58.8 MWPaused / redesign Sacramento, CACAISO Apr 2018target 2028
Battery storage project S0014, Washington County
Battery storage
58.0 MWIn study Washington, UTWest Nov 2022target 2026
Battery storage project IC-1267, Floyd County
Battery storage
57.5 MWAgreement signed Floyd, GASoutheast Mar 2024target 2026
Luyster Creek Energy Storage 1
Battery storage · Eastern Generation, LLC
57.3 MWIn study Queens, NYNYISO May 2019target 2027
Battery storage project 566170, Wake County
Battery storage · Duke Energy Progress, LLC
56.0 MWAgreement signed Wake, NCSoutheast Jun 2022target 2026
Battery storage project AG2-272, Pittsylvania County
Battery storage · Tupelo Storage, LLC
55.0 MWIn study Pittsylvania, VAPJM Feb 2025target 2024
Hardin Energy Center – Storage II
Battery storage
55.0 MWPaused / redesign Hardin, OHPJM Mar 2019target 2026
Battery storage project S0030, Crook County
Battery storage
55.0 MWIn study Crook, ORWest Feb 2024target 2026
Bluestem Solar
Battery storage · RWE Solar Development, LLC
55.0 MWIn study Laporte, INPJM Sep 2020target 2023
Battery storage project AH2-061, Prince William County
Battery storage
55.0 MWIn study Prince William, VAPJM Dec 2021target 2028
Battery storage project 313, Williamsburg County
Battery storage
55.0 MWIn study Williamsburg, SCSoutheast Jun 2025target 2029
Battery storage project AH2-060, Prince William County
Battery storage
55.0 MWIn study Prince William, VAPJM Dec 2021target 2027
Fighting Jays Battery
Battery storage
53.2 MWPaused / redesign Fort Bend, TXERCOT Aug 2021
Battery storage project AH2-145, King George County
Battery storage
52.3 MWIn study King George, VAPJM Feb 2022target 2027
Wythe County Solar Project
Battery storage
52.2 MWAgreement signed Wythe, VAPJM Mar 2019target 2027
Battery storage project GEN-2024-SR13, Bryan County
Battery storage
52.2 MWIn study Bryan, OKSPP May 2024target 2026
Clermont County Solar Project
Battery storage
52.2 MWPaused / redesign Clermont, OHPJM Jun 2019target 2025
Battery storage project AH2-372, Stephenson County
Battery storage
52.0 MWIn study Stephenson, ILPJM Mar 2022target 2028
Scafell Storage
Battery storage
52.0 MWIn study San Diego, CACAISO Apr 2020target 2029
Battery storage project GEN-2017-178, Garfield County
Battery storage
52.0 MWAgreement signed Garfield, OKSPP Nov 20172025
Steppe Reserve Storage
Battery storage · KCE TX 25, LLC
51.9 MWIn study Dimmit, TXERCOT Jan 2021target 2028
Orchard Ray BESS
Battery storage · Pettus BESS
51.9 MWIn study Bee, TXERCOT Jun 2023target 2027
High Chaparral BESS 138kV
Battery storage · High Chaparral Solar Project, LLC
51.7 MWPaused / redesign Brazoria, TXERCOT Jan 2021target 2023
Ryan Energy Storage
Battery storage · Ryan Storage LLC
51.6 MWAgreement signed Coryell, TXERCOT Jan 2019target 2026
Geranium Energy Storage
Battery storage
51.4 MWIn study San Diego, CACAISO Apr 2021target 2029
Ayass BESS
Battery storage · Harvick BESS, LLC
51.3 MWIn study Throckmorton, TXERCOT Dec 2023target 2028
Lumberjack Storage
Battery storage · EDP Renewables North America LLC
50.9 MWAgreement signed Cherokee, TXERCOT Aug 2021target 2029
Midpoint Storage
Battery storage · Midpoint Solar, LLC
50.9 MWAgreement signed Hill, TXERCOT Oct 2021target 2026
Ventasso Energy Storage
Battery storage
50.8 MWAgreement signed San Diego, CACAISO Apr 2019target 2026
Volunteer Storage
Battery storage · Blackjack Storage LLC
50.6 MWIn study Caldwell, TXERCOT Jan 2019target 2028
Township Power Bank
Battery storage
50.5 MWIn study Sutter, CACAISO Apr 2021target 2028
Verbena Energy Storage
Battery storage
50.5 MWIn study Sutter, CACAISO Apr 2021target 2028
Albatross BESS
Battery storage · Albatross Solar, LLC
50.4 MWIn study Mclennan, TXERCOT May 2022target 2028
Surfside Energy Storage
Battery storage · Rocky Mountain Energy Holdings, LLC
50.3 MWIn study Brazoria, TXERCOT Jul 2023target 2028
Page 39 of 45

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)