🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in the USA — page 368

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown24,2054,519.8 GW
Active in queue2,001.0 GW9,187 requests
Agreement signed423.2 GW2,141 requests
Withdrawn24,2054,519.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

24,205 requests · page 368 of 485
ProjectCapacityStatusLocationRegionQueuedOnline
Britain
Solar
21.7 MWWithdrawn / abandoned Kern, CACAISO Apr 2015target 2018
Trafalgar
Solar
21.7 MWWithdrawn / abandoned Kings, CACAISO Apr 2015target 2020
Other project Q390, Yuma County
Other
21.6 MWWithdrawn / abandoned Yuma, AZWest Mar 2021target 2017
Solar project GEN-2017-003, Little River County
Solar
21.6 MWWithdrawn / abandoned Little River, ARSPP Jan 2017target 2018
Solar project GEN-2017-002, Sebastian County
Solar
21.6 MWWithdrawn / abandoned Sebastian, ARSPP Jan 2017target 2018
Other project Q601, Yuma County
Other
21.6 MWWithdrawn / abandoned Yuma, AZWest May 2025target 2025
Gas project AE1-152, City Of Portsmouth County
Gas
21.5 MWWithdrawn / abandoned City Of Portsmouth, VAPJM Sep 2018target 2020
Delek Big Spring Solar
Solar · TotalEnergies Distributed Generation USA, LLC
21.4 MWWithdrawn / abandoned Howard, TXERCOT Feb 2025target 2027
Solar project GEN-2021-SR2, Muskogee County
Solar
21.4 MWWithdrawn / abandoned Muskogee, OKSPP Feb 20212022
Solar
Solar
21.4 MWWithdrawn / abandoned Grafton, NHISO-NE Oct 2022target 2024
Helmer
Battery storage · Dimension NY 1 LLC
21.3 MWWithdrawn / abandoned Herkimer, NYNYISO Nov 2019
New Salem substation - NG Western MA Area Cluster Study
Solar
21.3 MWWithdrawn / abandoned Worcester, MAISO-NE Mar 2019target 2020
Geothermal project 326-A, Beaver County
Geothermal
21.2 MWWithdrawn / abandoned Beaver, UTWest Mar 2010target 2014
Geothermal project 326-E, Beaver County
Geothermal
21.2 MWWithdrawn / abandoned Beaver, UTWest Mar 2010target 2014
Geothermal project 326-C, Beaver County
Geothermal
21.2 MWWithdrawn / abandoned Beaver, UTWest Mar 2010target 2014
Sanford/Quaker Hill CMP Cluster 4
Solar + storage
21.2 MWWithdrawn / abandoned York, MEISO-NE Mar 2022target 2028
Geothermal project 326-B, Beaver County
Geothermal
21.2 MWWithdrawn / abandoned Beaver, UTWest Mar 2010target 2014
Geothermal project 326-D, Beaver County
Geothermal
21.2 MWWithdrawn / abandoned Beaver, UTWest Mar 2010target 2014
Other project 958, Lincoln County
Other · Ormat Nevada, Inc.
21.2 MWWithdrawn / abandoned Lincoln, WYWest Oct 2017target 2020
Geothermal project 326-F, Beaver County
Geothermal
21.2 MWWithdrawn / abandoned Beaver, UTWest Mar 2010target 2014
Combined Cycle Uprate
Gas
21.1 MWWithdrawn / abandoned Providence, RIISO-NE Apr 2016target 2016
Ellenburg II Windfield
Onshore wind · Noble Environmental Power, LLC
21.0 MWWithdrawn / abandoned Clinton, NYNYISO Apr 2006
Solar project AG2-120, Martin County
Solar · Wildcat Road Solar, LLC
21.0 MWWithdrawn / abandoned Martin, NCPJM Feb 2025target 2024
Sanborn II Solar
Solar
21.0 MWWithdrawn / abandoned Kern, CACAISO Feb 2010target 2013
Winslow-County Rd Lakewood 115 kV SS - Winslow-County Rd-Lakewood 2 DG Study
Solar
21.0 MWWithdrawn / abandoned Kennebec, MEISO-NE Dec 2023target 2024
Gas project 558, Tooele County
Gas
21.0 MWWithdrawn / abandoned Tooele, UTWest Mar 2014target 2015
Barilla Solar 2
Solar · First Solar
21.0 MWWithdrawn / abandoned ERCOT Dec 2010target 2017
Onshore wind project G630, Big Stone County
Onshore wind
21.0 MWWithdrawn / abandoned Big Stone, MNMISO May 2006target 2007
Haskell Knox Wind Farm
Onshore wind · Duke Energy Generation Services
21.0 MWWithdrawn / abandoned ERCOT Jun 2008
Wild Sands Solar
Solar
21.0 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2014
Onshore wind project G697, Otter Tail County
Onshore wind
21.0 MWWithdrawn / abandoned Otter Tail, MNMISO Oct 2006target 2010
Onshore wind project 288, Elmore County
Onshore wind
21.0 MWWithdrawn / abandoned Elmore, IDWest Apr 2009target 2010
Rush Solar & BESS
Solar + storage · Hodson Energy Rush LLC
21.0 MWWithdrawn / abandoned Monroe, NYNYISO Feb 2023
Solar + storage project AH1-531, Pike County
Solar + storage
21.0 MWWithdrawn / abandoned Pike, OHPJM Sep 2021target 2025
Solar project 171806, Wilkes County
Solar
21.0 MWWithdrawn / abandoned Wilkes, NCSoutheast Jun 2021
Panem Solar
Solar
20.9 MWWithdrawn / abandoned Butte, CACAISO May 2016target 2019
Solar + storage project AH1-191, Tazewell County
Solar + storage
20.9 MWWithdrawn / abandoned Tazewell, ILPJM Sep 2021target 2025
Battery storage project AG2-217, Southampton County
Battery storage
20.9 MWWithdrawn / abandoned Southampton, VAPJM Mar 2021target 2023
Solar project GEN-2015-072, Ellis County
Solar
20.9 MWWithdrawn / abandoned Ellis, KSSPP Oct 2015target 2018
Ampchamp Storage
Battery storage
20.8 MWWithdrawn / abandoned San Diego, CACAISO Apr 2020target 2024
Solar
Solar
20.7 MWWithdrawn / abandoned Hancock, MEISO-NE Jul 2021target 2024
Battery storage project 892419, Person County
Battery storage · Duke Energy Progress, LLC
20.5 MWWithdrawn / abandoned Person, NCSoutheast May 2023
Eversource Group Study @ Crystal Spring
Solar + storage
20.5 MWWithdrawn / abandoned Plymouth, MAISO-NE Mar 2020target 2023
Niles Solar 1
Solar
20.5 MWWithdrawn / abandoned Kings, CACAISO May 2016target 2019
Wolverine Solar 1 - Fka Yuba Solar 1
Solar
20.5 MWWithdrawn / abandoned Fresno, CACAISO May 2016target 2019
ARCHER Solar 2
Solar · Leeward Renewable Energy Development, LLC
20.4 MWWithdrawn / abandoned Matagorda, TXERCOT target 2023
Ee K Battery 1
Battery storage
20.4 MWWithdrawn / abandoned Kings, CACAISO Apr 2021target 2024
N. Oxford Substation - NG WMA Group 3
Solar + storage
20.4 MWWithdrawn / abandoned Worcester, MAISO-NE Oct 2021target 2027
Stafford Street substation - NG Western MA Area Cluster Study
Solar
20.4 MWWithdrawn / abandoned Worcester, MAISO-NE Mar 2019target 2022
Battery storage project AE2-324, Marion County
Battery storage
20.3 MWWithdrawn / abandoned Marion, OHPJM Mar 2019target 2022
Page 368 of 485

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)