πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Arkansas

SOLAR Β· SPP

Solar project GEN-2017-003, Little River County

Solar project GEN-2017-003, Little River County is a 21.6 MW solar request withdrawn in the SPP interconnection queue, in Little River County, Arkansas, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2017 (completed)
  2. Withdrawn / abandonedNov 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2017-003
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
AEP
Connection point (POI)
Tap Nekoosa Tap-Ashdown 69 kV
Location
Little River County, Arkansas
Technology
Solar: 21.6 MW
Total requested
21.6 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
31 January 2017
Proposed online date
December 2018
Withdrawn
November 2017

Location

Marker shows the centre of Little River County; the queue data does not give exact sites.

Power plants in Arkansas Β· Transmission lines in Arkansas

Other requests in Little River County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem