United States βΊ Grid βΊ Interconnection queues βΊ Arkansas
SOLAR Β· SPPSolar project GEN-2022-088, Little River County
Solar project GEN-2022-088, Little River County is a 75.0 MW solar request withdrawn in the SPP interconnection queue, in Little River County, Arkansas, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2022 (completed)
- Withdrawn / abandonedMar 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2022-088
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- AEP
- Connection point (POI)
- South Foreman 138 kV Substation
- Location
- Little River County, Arkansas
- Technology
- Solar: 75.0 MW
- Total requested
- 75.0 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 15 November 2022
- Proposed online date
- September 2026
- Withdrawn
- March 2025
Location
Marker shows the centre of Little River County; the queue data does not give exact sites.
Other requests in Little River County
- Solar project GEN-2021-036, Little River CountySolar Β· 204 MW Β· agreement signed
- Battery storage project GEN-2022-045, Little River CountyBattery storage Β· 200 MW Β· withdrawn
- Solar project GEN-2022-047, Little River CountySolar Β· 200 MW Β· withdrawn
- Solar + storage project GEN-2024-115, Little River CountySolar + storage Β· 199 MW Β· withdrawn
- Solar project GEN-2018-023, Little River CountySolar Β· 126 MW Β· withdrawn
- Battery storage project GEN-2022-089, Little River CountyBattery storage Β· 75.0 MW Β· withdrawn
- Solar project GEN-2017-003, Little River CountySolar Β· 21.6 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem