SOLAR + STORAGE Β· PJMSolar + storage project AH1-191, Tazewell County
Solar + storage project AH1-191, Tazewell County is a 20.9 MW solar + storage request withdrawn in the PJM interconnection queue, in Tazewell County, Illinois, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2021 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-191
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Powerton 138 kV
- Location
- Tazewell County, Illinois
- Technology
- Solar: 20.9 MW Β· Battery
- Total requested
- 20.9 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 1 September 2021
- Proposed online date
- June 2025
- Withdrawn
- December 2024
Location
Marker shows the centre of Tazewell County; the queue data does not give exact sites.
Other requests in Tazewell County
- Battery storage project J3946, Tazewell CountyBattery storage Β· 300 MW Β· in study
- Solar project AG2-363, Tazewell CountySolar Β· 300 MW Β· in study
- Onshore wind project J1926, Tazewell CountyOnshore wind Β· 200 MW Β· in study
- Battery storage project J3298, Tazewell CountyBattery storage Β· 200 MW Β· in study
- Solar project AG2-364, Tazewell CountySolar Β· 200 MW Β· in study
- Battery storage project J2575, Tazewell CountyBattery storage Β· 198 MW Β· in study
- Onshore wind project J3905, Tazewell CountyOnshore wind Β· 175 MW Β· in study
- Battery storage project J3904, Tazewell CountyBattery storage Β· 175 MW Β· in study
- Solar project J1653, Tazewell CountySolar Β· 150 MW Β· in study
- Onshore wind project J3456, Tazewell CountyOnshore wind Β· 100 MW Β· in study
- Onshore wind project J1725, Tazewell CountyOnshore wind Β· 100 MW Β· in study
- Battery storage project J1882, Tazewell CountyBattery storage Β· 45.0 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem