BATTERY STORAGE Β· PJM

Battery storage project AE2-324, Marion County

Battery storage project AE2-324, Marion County is a 20.3 MW battery storage request withdrawn in the PJM interconnection queue, in Marion County, Ohio, connecting to ATSI.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2019 (completed)
  2. Withdrawn / abandonedJun 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AE2-324
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ATSI
Connection point (POI)
Galion-Roberts South II 138 kV
Location
Marion County, Ohio
Technology
Battery: 20.3 MW
Total requested
20.3 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Withdrawn
Entered queue
30 March 2019
Proposed online date
December 2022
Withdrawn
June 2022

Location

Marker shows the centre of Marion County; the queue data does not give exact sites.

Power plants in Ohio Β· Transmission lines in Ohio

Other requests in Marion County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem