United States βΊ Grid βΊ Interconnection queues βΊ Ohio
BATTERY STORAGE Β· PJMBattery storage project AE2-324, Marion County
Battery storage project AE2-324, Marion County is a 20.3 MW battery storage request withdrawn in the PJM interconnection queue, in Marion County, Ohio, connecting to ATSI.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2019 (completed)
- Withdrawn / abandonedJun 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AE2-324
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Connection point (POI)
- Galion-Roberts South II 138 kV
- Location
- Marion County, Ohio
- Technology
- Battery: 20.3 MW
- Total requested
- 20.3 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 30 March 2019
- Proposed online date
- December 2022
- Withdrawn
- June 2022
Location
Marker shows the centre of Marion County; the queue data does not give exact sites.
Other requests in Marion County
- Marion County Solar ProjectSolar Β· 100 MW Β· agreement signed
- Green Camp Solar IISolar + storage Β· 110 MW Β· in study
- Solar project AG2-119, Marion CountySolar Β· 80.0 MW Β· in study
- Solar + storage project AH2-344, Marion CountySolar + storage Β· 45.0 MW Β· in study
- Solar project AI2-341, Marion CountySolar Β· 22.8 MW Β· in study
- Solar + storage project AI1-175, Marion CountySolar + storage Β· 19.5 MW Β· in study
- Chestnut SolarSolar Β· 60.0 MW Β· suspended
- Onshore wind project X3-030, Marion CountyOnshore wind Β· 245 MW Β· withdrawn
- Solar project AB2-131, Marion CountySolar Β· 150 MW Β· withdrawn
- Solar project AG2-595, Marion CountySolar Β· 65.0 MW Β· withdrawn
- Solar project AG2-218, Marion CountySolar Β· 49.5 MW Β· withdrawn
- Solar project AH1-572, Marion CountySolar Β· 30.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem