SOLAR Β· PJMChestnut Solar
Chestnut Solar is a 60.0 MW solar request suspended in the PJM interconnection queue, in Marion County, Ohio, connecting to AEP.
Queue statusPaused / redesign
- PlanningQueued Sep 2017 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AD1-106
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- North Waldo-Wild Creek 138 kV
- Location
- Marion County, Ohio
- Technology
- Solar: 60.0 MW
- Total requested
- 60.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Suspended
- Entered queue
- 23 September 2017
- Proposed online date
- December 2026
Location
Marker shows the centre of Marion County; the queue data does not give exact sites.
Other requests in Marion County
- Marion County Solar ProjectSolar Β· 100 MW Β· agreement signed
- Green Camp Solar IISolar + storage Β· 110 MW Β· in study
- Solar project AG2-119, Marion CountySolar Β· 80.0 MW Β· in study
- Solar + storage project AH2-344, Marion CountySolar + storage Β· 45.0 MW Β· in study
- Solar project AI2-341, Marion CountySolar Β· 22.8 MW Β· in study
- Solar + storage project AI1-175, Marion CountySolar + storage Β· 19.5 MW Β· in study
- Onshore wind project X3-030, Marion CountyOnshore wind Β· 245 MW Β· withdrawn
- Solar project AB2-131, Marion CountySolar Β· 150 MW Β· withdrawn
- Solar project AG2-595, Marion CountySolar Β· 65.0 MW Β· withdrawn
- Solar project AG2-218, Marion CountySolar Β· 49.5 MW Β· withdrawn
- Solar project AH1-572, Marion CountySolar Β· 30.0 MW Β· withdrawn
- Solar project AH1-075, Marion CountySolar Β· 24.7 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem