United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· PJMSolar project AH1-572, Marion County
Solar project AH1-572, Marion County is a 30.0 MW solar request withdrawn in the PJM interconnection queue, in Marion County, Ohio, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2021 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-572
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Developer
- Swamp Fox Solar, LLC
- Connection point (POI)
- South Morral-Uncapher Switch 69 kV
- Location
- Marion County, Ohio
- Technology
- Solar: 30.0 MW
- Total requested
- 30.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Withdrawn
- Entered queue
- 10 September 2021
- Proposed online date
- December 2024
- Withdrawn
- July 2025
Location
Marker shows the centre of Marion County; the queue data does not give exact sites.
Other requests in Marion County
- Marion County Solar ProjectSolar Β· 100 MW Β· agreement signed
- Green Camp Solar IISolar + storage Β· 110 MW Β· in study
- Solar project AG2-119, Marion CountySolar Β· 80.0 MW Β· in study
- Solar + storage project AH2-344, Marion CountySolar + storage Β· 45.0 MW Β· in study
- Solar project AI2-341, Marion CountySolar Β· 22.8 MW Β· in study
- Solar + storage project AI1-175, Marion CountySolar + storage Β· 19.5 MW Β· in study
- Chestnut SolarSolar Β· 60.0 MW Β· suspended
- Onshore wind project X3-030, Marion CountyOnshore wind Β· 245 MW Β· withdrawn
- Solar project AB2-131, Marion CountySolar Β· 150 MW Β· withdrawn
- Solar project AG2-595, Marion CountySolar Β· 65.0 MW Β· withdrawn
- Solar project AG2-218, Marion CountySolar Β· 49.5 MW Β· withdrawn
- Solar project AH1-075, Marion CountySolar Β· 24.7 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem