United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

ONSHORE WIND Β· MISO

Onshore wind project G697, Otter Tail County

Onshore wind project G697, Otter Tail County is a 21.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Otter Tail County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2006 (completed)
  2. Withdrawn / abandonedSep 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G697
Grid region
MISO (Midcontinent)
Connection point (POI)
OTP Pelican Rapid - Edge Tap 115 kV
Location
Otter Tail County, Minnesota
Technology
Wind: 21.0 MW
Total requested
21.0 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
31 October 2006
Proposed online date
December 2010
Withdrawn
September 2014

Location

Marker shows the centre of Otter Tail County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Otter Tail County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem