Battery storage project J3778, Otter Tail County

Battery storage project J3778, Otter Tail County is a 100 MW battery storage request withdrawn in the MISO interconnection queue, in Otter Tail County, Minnesota, connecting to MISSOURI RIVER ENERGY SERVICES - TRANSMISSION.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandonedSep 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3778
Grid region
MISO (Midcontinent)
Utility / transmission owner
MISSOURI RIVER ENERGY SERVICES - TRANSMISSION
Connection point (POI)
Fergus Falls MRES/WMMPA
Location
Otter Tail County, Minnesota
Technology
Battery: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 1
Queue status
Withdrawn
Entered queue
15 April 2024
Proposed online date
August 2028
Withdrawn
September 2025

Location

Marker shows the centre of Otter Tail County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Otter Tail County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem