ONSHORE WIND Β· MISOOnshore wind project G721, Otter Tail County
Onshore wind project G721, Otter Tail County is a 160 MW onshore wind request withdrawn in the MISO interconnection queue, in Otter Tail County, Minnesota.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2006 (completed)
- Withdrawn / abandonedMay 2012 (project stopped here)
- ConsentedMay 2012 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G721
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Bison - Alexandria S.S. 345kV
- Location
- Otter Tail County, Minnesota
- Technology
- Wind: 160 MW
- Total requested
- 160 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 19 December 2006
- Agreement signed
- 22 May 2012
- Proposed online date
- March 2012
- Withdrawn
- May 2012
Location
Marker shows the centre of Otter Tail County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Otter Tail County
- Solar project J4091, Otter Tail CountySolar Β· 295 MW Β· in study
- Onshore wind project J4129, Otter Tail CountyOnshore wind Β· 200 MW Β· in study
- Solar + storage project J3742, Otter Tail CountySolar + storage Β· 160 MW Β· in study
- Hoot Lake Battery Energy Storage SystemBattery storage Β· 90.7 MW Β· in study
- Replace Hoot Lake units 2 and 3 (144.8 MW) with Seventeen (17) Sungrow 3 MW solar inverters and PV panels at 49.9 MW; Hoot Lake 2 & 3Other Β· 49.9 MW Β· in study
- Onshore wind project G619, Otter Tail CountyOnshore wind Β· 50.0 MW Β· built
- Other project G146, Otter Tail CountyOther Β· 4.0 MW Β· built
- Replace 350 MW of ALTW.FPL_DAEC Unit with Solar; Duane ArnoldOther Β· 350 MW Β· withdrawn
- Solar project GEN-2024-269, Otter Tail CountySolar Β· 315 MW Β· withdrawn
- Battery storage project J3778, Otter Tail CountyBattery storage Β· 100 MW Β· withdrawn
- Onshore wind project G843, Otter Tail CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project J193, Otter Tail CountyOnshore wind Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem